Laserfiche WebLink
For each replacement u£ a heating n¥otcm <br /> <br />l) No increase in capacity <br />.ii) Increase in capacity Base Fee <br /> Plus $.08 £or every BTU/lit. added <br /> <br />C) Commercial Incinerator <br /> <br />2) Refrigeration & Air Conditioning <br /> <br />a) <br /> <br />Refrigeration systems, new installations or <br />alterations, according to quantity of refrigerant <br />in system <br /> <br />7.~0 <br /> <br />15. O0 <br /> <br />Up to 5 lbs. <br />Over 5 lbs to 20 lbs <br />Over 20 lbs to 100 lbs <br />Over 100 lbs <br /> <br /> Group 1 <br />Refvigerants <br /> <br /> Group 2 <br />Refrigerants <br /> <br /> Group 3 <br />Refrigerants <br /> <br />no fee no fee 5.00 <br />no fee 5.00 7.50 <br />7.50 7.50 12.50 <br />12.50 12.50 25.00 <br /> <br />b) Classification Refrigerant Groups Defined <br /> <br />Group 1 <br /> <br />GrouP 2 <br /> <br />Carbon Dioxide (C02) Carrene No. 1 (CtI2CL2) <br />Carrene No. 2 (CCL3F), Freon ll i Freon 12 (CCL2F21 <br />Freon 21 (CHCL2F), Fre6n 22 (CHCLF2), Freon <br />113 (C2C13F3) and Freon 114 (C2C12F4) <br />Ammonia (NIl3), Dichloroethylene (C21t2C12), <br />Ethyl Chloride (C2tI5CL). Methyl Chloride <br />(CH3CL), Meth. y. 1 Formate (HCOOCiI3), and Sulphur <br />Dioxide (SO2). <br /> <br />c) <br /> <br /> Group 3 Butane, (C4HIo), Ethane (C2H6), Ethylene (C2H4), <br /> Isabutane (CH33CH) and Propane (C3H8) <br /> <br />For each water cooling tower 10.00 <br /> <br />For each summer air conditioning unit <br /> <br /> i) Up to 5 ton capacity <br /> ii) Over 5 ton capacity up to 10 ton capacity <br /> iii) Over 10 ton capacity up to 25 ton capacity <br /> iv) All over 25 ton capacity <br /> <br />V. SIGN PER}lIT FEE <br /> <br />10.00 <br />iS.00 <br />20.00 <br />25.00 <br /> <br />Aa Signs up to and including $100 of valuation <br /> <br />3.00 <br /> <br />For each $100 of valuation or part thereof in <br />excess of $100 ' .' <br /> <br />.5O <br /> <br /> C. Temporary signs, each <br />VI. CO}[BINATION PER}lIT FEE <br /> <br />3.00 <br /> <br />Notwithscanding any other provisions of this ordinance, <br />a home owner who occupies the premises wherein the work <br />is to be performed may obtain a combination permit fee <br />~o cover all alterations, remodeling, plumbing, electrical <br />or heating work, provided that the value of such work <br />shall not exceed Two Hundred Fifty Dollars ($250.00) <br />in total. <br /> <br />3.00 <br /> <br /> <br />