My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
76-06 Amend Chapter 1309 Permit Fees
Document-Host
>
City of Lakewood
>
Ordinances
>
2006
>
76-06 Amend Chapter 1309 Permit Fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 3:13:01 PM
Creation date
10/31/2007 7:57:25 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Ordinances
Date
10/31/2007
Date Adopted
12/18/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
For any inspections made for the issuance of a Certificate of Occupancy, there shall be <br /> charged. a fee of fifty dollars ($50.00) for residential and seventy-five dollars <br /> ($75.00) for commercial. <br /> 1309.12 REFUSAL TO ISSUE PERMIT; APPEAL. <br /> The Building Official may deny any applicant a permit who-has outstanding violations <br /> that have not been corrected as of the date an additional permit is requested, or if <br /> past performance indicates a pattern of noncompliance with an applicable building <br /> ordinance. In the event the application far a permit is denied, the applicant shall be <br /> notified of such refusal in writing, and such notice shall be sent by certified mail to <br /> the applicant at the address of the applicant, as set forth in the application for a <br /> permit. The applicant shall have ten days after receipt of such notice within which <br /> to appeal the refusal. Such appeal shall be perfected by filing a written notice of <br /> appeal with the Director of Public Safety. Thereupon the applicant shall have not <br /> less than ten days notice of the date and place of the hearing. The appeal shall be <br /> heard by the Board of Building and Zoning Code Appeals or by the Board of Building <br /> Standards if such is existing at the time of the refusal by the Building Official. The <br /> Board shall have the power after such hearing to confirm the refusal or order the <br /> permit to be issued. <br /> 1309.13 AGGREGATE FLOOR AREA. <br /> For the purposes of this chapter, the aggregate floor area shall be the sum of the gross <br /> horizontal areas at the several floors, including basements, cellars and attics that are <br /> at least fifty percent (50%) habitable. All horizontal dimensions shall be taken from <br /> the exterior faces of walls, including enclosed porches. <br /> 1309.14 COST ESTIMATES. <br /> Where the permit is based upon cost of the work done under the permit, such costs <br /> shall be the actual cost as certified by the owner or authorized representative of the <br /> owner, and as approved by the Building Inspector. The Building Inspector may, at <br /> any time up to three months after the completion of the work, require the <br /> submission of authoritative estimates or actual cost data to substantiate the <br /> estimated cost stated in the application, and require the payment. of additional fees <br /> when it is demonstrated that the actual cost of the. work is in excess of the <br /> estimated cost upon which permit fees were based. <br /> 1309.15 PLANS EXAMINER FEE. <br /> Whenever the Building Commissioner determines that an examination of construction <br /> plans by a professional plans examiner is necessary for the enforcement of the <br /> Building Code or required by other applicable law, there shall be charged a fee of <br /> one hundred and fifty dollars ($150.00), plus three dollars ($3.00) per 100 square <br /> feet, or part thereof, of the proposed structure, and an additional fee in the amount <br /> of one hundred percent (100%) of the original plans examination fee for all <br /> resubmittals. <br /> Shall be and is hereby amended to read as follows: <br /> 1309.01 PAYMENT PROCEDURE. <br /> <br /> The fees to be paid for building permits shall be determined by the Building <br /> Commissioner in accordance with the following schedule and shall be noted upon <br /> the, application when approved for the issuing of the permit. Such fees are to be <br /> paid to the Building Department which, upon receipt of such fees, shall issue the <br /> permit to the applicant. The fees to be paid shall be as are provided in this chapter. <br /> (Ord. 11-91. Passed 3-491.) <br /> 1309.02 BUILDING PERMIT FEES. <br /> (a) New Buildings and Structures. <br /> (1) Residential. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.