Laserfiche WebLink
<br />As construction progresses and the topography is altered, appropriate controls must be <br />constructed or existing controls altered to address the changing drainage patterns. <br /> <br />(h) Stabilization of Denuded Areas: Disturbed areas must be stabilized as specified <br />in the tables below, or according to the Ohio EPA NPDES Storm Water Permit Rules, <br />whichever is most restrictive: <br /> <br /> <br />Any areas that will lie dormant for <br />one (1) year or more <br /> <br />Any areas within fifty (50) feet of a <br />stream and at final grade <br /> <br />Any other areas at final grade <br /> <br />Table 3: Temporary Stabilization <br /> <br />Within seven (7) days of the most recent <br />disturbance <br /> <br />Within two (2) days of reaching final grade <br /> <br />Within seven (7) days of reaching final grade <br />within that area <br /> <br /> <br />Any disturbed areas within fifty (50) <br />feet of a stream and not at final <br />grade <br /> <br />Disturbed areas that will be <br />dormant for more than 21 days but <br />less than one (1) year and not <br />within fifty (50) feet of a stream <br /> <br />Disturbed areas that will be idle <br />over winter <br /> <br />Within two (2) days of the most recent <br />disturbance if the area will remain idle for <br />twenty-one (21) days or more <br /> <br />Within seven (7) days of the most recent <br />disturbance within the area. <br /> <br />Prior to the onset of winter weather <br /> <br />Where vegetative stabilization techniques may cause structural instability or are <br />otherwise unobtainable, alternative stabilization techniques must be employed. <br /> <br />In any case, Temporary or Permanent Stabilization will be properly installed, <br />pursuant to the most recent edition of the Ohio Rainwater and Land Development <br />manual, before the second building permit is issued. <br /> <br />(i) Sediment Settling Ponds: Storm water runoff that exceeds the design capacity of <br />sediment barriers and concentrated storm water flows shall pass through a sediment <br />settling facility. <br /> <br />20 <br />