My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
28-14 Amend Chp. 1339 Storm Water Mgmt
Document-Host
>
City of Lakewood
>
Ordinances
>
2014
>
28-14 Amend Chp. 1339 Storm Water Mgmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 4:54:01 PM
Creation date
12/19/2014 4:53:02 PM
Metadata
Fields
Template:
Office Of Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ix. BMPs that divert runoff away from disturbed areas and steep <br />slopes where practicable including rock check dams, pipe <br />slope drains, diversions to direct flow away from exposed <br />soils, and protective grading practices, <br />x. Sediment settling ponds drawn to scale. <br />xi. Existing and proposed locations of buildings, roads, parking <br />facilities and utilities. <br />xii. Boundaries of wetlands and stream channels the owner in- <br />tends to fill or relocate for which the owner is seeking ap- <br />proval from the US Army Corps of Engineers and Ohio EPA. <br />(2) The construction site conservation plan shall include a list of soil ero- <br />sion and sediment control BMPs being used and the standards and <br />specifications, including detailed drawings, for each BMPs. This list <br />shall include: <br />A. Methods of controlling the flow of runoff fi-mn disturbed areas so <br />as to prevent or minimize erosion. <br />B. Identification of the structural practices to be used to control ero- <br />sion and tap sediment from a site remaining disturbed for more <br />than 14 days. A description shall be included of how each selected <br />control will store runoff so as to let sediments settle out and divert <br />flows away from exposed soils or act to limit runoff from exposed <br />areas. <br />C. Identification for each structural practice of its size, detail draw- <br />ings, maintenance requirements and design calculations. <br />D. The type and amount of plant seed, live plants, fertilizer, agricul- <br />tural ground limestone and mulch to be used. Specification of soil <br />testing requirements for fertility and time requirements will be in- <br />cluded. Specification for the use of perermial grass seed will also <br />be included. <br />E. Settling ponds will be identified with basic dimensions and the <br />calculations for size and volume. <br />F. Detailed drawings and installation requirements of all other struc- <br />tural control BMPs. <br />G. Any other soil erosion and sediment control related BMPs and <br />items that are required by the city engineer. <br />H. For developments where the overall plan does not call for central- <br />ized sediment control capable of controlling multiple individual <br />lots, a detail drawing of a project specific typical individual lot <br />showing standard individual lot soil erosion and sediment control <br />practices and the sequence and timing of BMP installation for the <br />individual lots. This does not remove or eliminate the responsibil- <br />ity to designate and install specific soil erosion and sediment con- <br />trol practices for the storm water discharges. <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.