Laserfiche WebLink
opment if the post - development peak discharge for a 100 -year fre- <br />quency 24 -hour storm increases the existing peak discharge by one <br />cubic foot per second or less using the TR -55 method of calcu- <br />lation or other method approved by the city engineer. The city <br />engineer can waive this requirement if existing storm sewers and <br />drainage structures can safely handle the expected increase in flow. <br />B. Only one exemption will be allowed per parcel. Any subsequent <br />expansion must provide for detention or retention and must include <br />the previously exempted area. <br />(5) Where the city engineer determines that site constraints exist in a man- <br />ner that compromises the intent of this regulation to improve the man- <br />agement of storm water runoff as established in this section, practical <br />alternatives may be used to result in an improvement of water quality <br />and a reduction of storm water runoff. Such alternatives must be in <br />keeping with the intent and likely cost of those measures that would <br />otherwise be required to meet the objectives of this section. When pos- <br />sible, all practical alternatives shall be implemented within the drainage <br />area of the proposed development project. Practical alternatives can in- <br />clude, but are not limited to: <br />A. Fees shall be paid in an amount specified by the city engineer. <br />These fees shall be applied by the City to storm water management <br />practices that reduce existing storm water runoff. <br />B. Implementation of off -site storm water management practices. <br />C. Watershed or stream restoration. <br />D. Retrofitting of an existing storm water management practice. <br />E. Other practices approved by the city engineer in keeping with the <br />intent of this section. <br />(aa) Application Procedures for Construction Conservation Plans (CCP): <br />(1) This plan will be combined with the post - construction water quality, ri- <br />parian setback and wetland setback plans that have also been developed <br />for the site. <br />(2) Plans developed by the site owners and approved by the City in accord- <br />ance with this regulation do not relieve the site owner of responsibility <br />for obtaining and complying with all other necessary permits and ap- <br />provals from federal, state, county, and local agencies and departments. <br />If requirements vary, the most stringent requirement shall be followed. <br />Plans submitted to the city engineer for review and approval shall be <br />accompanied by all other required permits and documentation relevant <br />to the project, including but not limited to the permits required and is- <br />sued by the U.S. Army Corps of Engineers, Ohio EPA and ODNR Di- <br />vision of Water. <br />(3) The application must include a letter or report from the local county <br />SWCD that states that the construction site conservation plan, the ripar- <br />ian and wetland setback plan and the post - construction water quality <br />53 <br />