Laserfiche WebLink
Table 1 Runoff Coefficients Based on the Type of Land Use <br />Land Use <br />Runoff Coefficient <br />Industrial and Commercial <br />0.8 <br />High Density Residential ( >8 dwellings /acre) <br />0.5 <br />Medium Density Residential (4 to 8 dwellings /acre) <br />0.4 <br />Low Density Residential ( <4 dwellings /acre) <br />0.3 <br />Open Space and Recreational Areas <br />0.2 <br />(4) Where the land use will be mixed, the runoff coefficient should be cal- <br />culated using a weighted average. For example, if 60 percent of the <br />contributing drainage area to the storm water treatment structure is low <br />density residential, 30 percent is high density residential, and 10 per- <br />cent is open space, the runoff coefficient is calculated as follows <br />(0.6)(0.3) + (0.3)(0.5) + (0.1)(0.2) = 0.35. <br />(5) An additional volume equal to 20 percent of the WQv shall be incorpo- <br />rated into the BMP for sediment storage and reduced infiltration ca- <br />pacity. The BMPs will be designed according to the methodology in- <br />cluded in the Ohio Rainwater and Land Development manual, ODOT <br />post - construction storm water standards, or other manual that is ac- <br />ceptable to Ohio EPA. <br />(6) The BMPs listed in Table 2 below shall be considered standard BMPs <br />approved for general use. However, the City may limit the use of some <br />of these BMPs. BMPs shall be designed such that the drain time is long <br />enough to provide treatment, but short enough to provide storage avail- <br />able for successive rainfall events and avoid the creation of nuisance <br />conditions. The outlet structure for the post - construction BMP must not <br />discharge more than the first half of the WQv in less than one third of <br />the drain tine. <br />Table 2: Target Drain Times for Structural Post- Construction BMPs <br />BMPs Suitable for Drainage Areas >_ 5 <br />BMPs Suitable for Drainage <br />Areas :5 5 <br />Best Management Prac- <br />Drain <br />Best Management <br />Drain <br />tice <br />Time <br />Practice <br />Time <br />Dry Extended Detention <br />48 Hours <br />Infiltration Basins <br />24 -48 <br />Basin* <br />or TrenchA <br />Hours <br />Wet Extended Detention <br />24 Hours <br />Bioretention Ar- <br />24 Hours <br />Basin ** <br />ea/Cell <br />Constructed Wetlands+ <br />24 Hours <br />Sand and Other <br />24 Hours <br />Media Filters <br />Infiltration BasinsA <br />24-48 <br />Enhanced Water <br />24 Hours <br />Hours <br />Quality Swales <br />Pocket Wetlands# <br />24 Hours <br />Vegetated Filter <br />24 Hours <br />Strips <br />Permeable Pave- <br />48 Hours <br />59 <br />