My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
28-14 Amend Chp. 1339 Storm Water Mgmt
Document-Host
>
City of Lakewood
>
Ordinances
>
2014
>
28-14 Amend Chp. 1339 Storm Water Mgmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 4:54:01 PM
Creation date
12/19/2014 4:53:02 PM
Metadata
Fields
Template:
Office Of Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
through the use of pervious pavement or green roofs. Where projects are a <br />combination of new development and redevelopment, the total WQv that <br />must be treated shall be calculated by a weighted average based on acreage, <br />with new development at 100 percent and redevelopment at 20 percent <br />WQv. <br />(s) Alternative Actions: Where the city engineer determines that site constraints <br />exist in a manner that compromises the intent of this regulation to improve <br />the management of storm water runoff as established in this regulation, <br />practical alternatives may be used to result in an improvement of water <br />quality and a reduction of storm water runoff. Such alternatives must be in <br />keeping with the intent and likely cost of those measures that would other- <br />wise be required to meet the objectives of this section. All practical alterna- <br />tives shall be implemented within the drainage area of the proposed devel- <br />opment project unless specifically authorized in writing by the city engi- <br />neer. <br />(t) Implementation of off -site storm water management practices: The use of <br />any off -site post - construction BMPs requires written approval from Ohio <br />EPA and this approval must be received prior to design approval and issu- <br />ance of any building permits. Practical alternatives to be considered include: <br />(1) Retrofitting of an existing storm water management practice. <br />(2) Watershed or stream restoration. <br />(3) Fees paid in an amount specified by the city engineer. The City shall <br />apply these fees to storm water management practices that improve the <br />existing water quality. <br />(u) Use of Alternative Post - Construction BMPs: Pernnittees must supply written <br />approval from Ohio EPA to use post - construction BMPs that have been <br />demonstrated to be equivalent to the effectiveness of those listed in Table 2 <br />above. Approval from Ohio EPA must be received prior to design approval <br />and issuance of any building permits. <br />(v) Other practices approved by the city engineer may be made a part of the <br />comprehensive storm water management plan in keeping with the intent of <br />this section. <br />(w) Application Procedures for Post-Construction Water Quality Plans: <br />(1) This plan will be combined with the soil erosion and sediment control, <br />storm water management, riparian setback and wetland setback plans <br />that have also been developed for the site. <br />(2) Plans developed by the site owners and approved by the City in accord- <br />ance with this regulation do not relieve the site owner of responsibility <br />for obtaining all other necessary permits and approvals from federal, <br />state, county, and local agencies and departments. If requirements vary, <br />the most stringent requirement shall be followed. <br />(3) The site owner shall submit a report from the local county soil and wa- <br />ter conservation district, which reviews the owner's development, plans <br />and improvement plans. The applicant or his or her designated repre- <br />sentative will pay any costs associated with obtaining the report(s) from <br />66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.