My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5781-83 Resurface Detroit Road
Document-Host
>
City of Lakewood
>
Resolutions
>
1983
>
5781-83 Resurface Detroit Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 3:12:42 PM
Creation date
10/23/2007 8:51:27 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
Date
10/23/2007
Date Adopted
5/27/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ITEM NO. APPROXIMATE ~ ITEM UNIT PRICE TOTAL <br /> QUANTITIES Dollsrs Cents Dollars Cer <br /> 604 3 each catch basin grate CB-3A <br /> 16 604 3 each catch basin frame CB-3A <br /> 17 604 140 each City of Cleveland manhole cover <br /> No. A-605 <br /> 18 604 140 each City of Cleveland manhole frame <br /> No. A-503 <br /> 19 604 65 each City of Cleveland water valve <br /> box cover Nos. 1 and 2 <br /> 20 604 49 each City of Cleveland water valve <br /> box cover Nos. 3 and 4 <br /> 21 604 2 each City of Cleveland air cock box <br /> cover Nos. 5 and 6 <br /> 22 604 34 each City of Cleveland monument box <br /> cover No. A-37 <br /> 23 604 35 each City of Cleveland catch basin <br /> frame No. A-694 <br /> 24 604 20 each City of Cleveland monument box <br /> frame No. A-37 <br /> 25 614 6.4 miles temporary center lines <br /> 26 614 12.8 miles temporary lane lines <br /> 27 202 5,900 lin.ft. curb removed <br /> 28 609 870 lin.ft. curb, type 6 <br /> 29 609 5,030 lin.ft. integral curb <br /> 30 608 ;6,110 sq.ft. concrete walk <br /> 31 5;08 5 each curb ramp, type 1, as per plan <br /> 32 659 292 sq.yds. seeding and mulching <br /> 33 202 6,110 sq.ft. concrete walk removed <br /> 34 624 Lump Mobilization <br /> JGx>! X.141tip P~1fA6Dfb'9E~41S <br /> 35 703.05 Lump Premium for Contract Performance Bond and for Payment Bond <br /> $YR Xao>atpc Cotxttnttt?OtxlfayoYlX Sta'R1t9' <br /> 36 614 lump Maintaining Traffic <br /> 37 Total AmountofXAdfWItXMMis THE 8i? $ <br /> Estimated Cost of Repairs to Detour S <br /> stimated Cost of Right of Way $ <br /> <br /> Estimated Cost of Engineering, Superintendence and Contingencies S <br /> "estimated Cost of Preliminary Engineering $ <br /> Approxjmate Total Con and Expense S <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.