My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7045-95 Submerged Lands - the Carlyle
Document-Host
>
City of Lakewood
>
Resolutions
>
1995
>
7045-95 Submerged Lands - the Carlyle
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 3:06:00 PM
Creation date
8/22/2003 6:44:45 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
Date
8/22/2003
Date Adopted
5/1/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A, pg. 2 <br /> <br />PROJECT DESCRIPTION <br /> <br /> The proje~ consists of excavating a one foot deep trench in the <br /> lake bottom about 60 feet waterward of the toe of the bluff, <br /> setting a row of seven ton stones in the trench that will form a <br /> toe to retain concrete rubble that will be dumped landward of the <br /> toe stone, place filter fabric over the rubble to retain fine <br /> material, 'place a two foot thick by alS foot wide layer of <br /> medium stone at the bottom of the rubble as bedding for an about <br /> 15 foot wide layer of three to seven ton armor stone, cover the <br /> remainder of the rubble with topsoil and plant with crown vetch <br /> or other suitable Vegetation to retain the soil. AbOut 13,500 <br /> cubic yards of material will be used to construct the revetment. <br /> About 4,100 cubic yards .of the fill will be placed below DA <br /> jurisdiction which is ordinary high water (OHW) elevation 573.4 <br /> feet International Great Lakes Datum (IGLD) 1985. The applicant <br /> also proposes to construct a 15 foot wide pier out of concrete <br /> capped, stone filled, steel cribs extending about 30 feet <br /> waterward from the revetment. 'About 170 cubic yards of heavy <br /> stone will be used to fill the cribs. About 100 cubic yards of <br /> the stone will be placed below DA jurisdiction of OHW elevation <br /> 5?3.4 feet (IGLD 1985). <br /> <br />The purpose of the project is to prevent further erosion of the <br />bluff which will endanger the condominium building and to provide' <br />the condo occupants access to the lake for fishing. <br /> <br />Location and details of the above described work are shown on the <br />· attached maps and drawings. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.