Laserfiche WebLink
Exhibit A, pg. 2 <br /> <br />PROJECT DESCRIPTION <br /> <br />The project consists of excavating a one foot deep trench in the <br />lake bottom about 60 feet waterward of the toe of the bluff, <br />setting a row of seven ton stones in the trench that will form a <br />toe to retain concrete rubble that will be dumped landward of the <br />toe stone, place filter fabric over the rubble to retain fine <br />material, place a two foot thick by alS foot wide layer of <br />medium stone at the bottom of the rubble as bedding for an about <br />15 foot wide layer of three to seven ton armor stone, cover the <br />remainder of the rubble with topsoil and plant with crown vetch <br />or other suitable vegetation to retain the soil. About 13,500 <br />cubic yards of material will be used to construct the revetment. <br />About 4,100 cubic yards.of the fill will be placed below DA <br />jurisdiction which is ordinary high water (OHW) elevation 5?3.4' <br />feet International Great Lakes Datum (IGLD) 19S5. The applicant <br />also proposes to construct alS foot wide pier out of concrete <br />capped, stone filled, steel cribs extending about 30 feet <br />waterward from the revetment. About 170 cubic yards of heavy <br />stone will be used to fill the cribs. About 100 cubic yards of <br />the stone will be placed below DA jurisdiction of OHW elevation <br />5?3.4 feet (IGLD 1985). <br /> <br />The purpose of the project is t° prevent further erosion of the <br />bluff which will endanger the condominium building and to provide' <br />the condo occupants access to the lake for fishing. <br /> <br />Location and details of the above described work are shown on the <br />attached maps and drawings. <br /> <br /> <br />