My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8805-15 Agreement w/ Everstream Inc. for fiber optic communication system
Document-Host
>
City of Lakewood
>
Resolutions
>
2015
>
8805-15 Agreement w/ Everstream Inc. for fiber optic communication system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2015 10:51:04 AM
Creation date
9/25/2015 10:50:15 AM
Metadata
Fields
Template:
Office Of Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
everstream <br />2) Berea Road from 11710 Berea Road (corner of W 117 & Berea Road) to 12920 Berea Road (City's Refuse & Recycling Center) <br />EXHIBIT B <br />FIBER AND AS BUILT SPECIFICATIONS <br />Fiber Specifications. The fibers installed in the GRANTOR <br />System shall be single mode fiber with a maximum attenuation Q <br />1550nm of 0.6 ifil <br />As Built Specficatmm Theer- builtd .... mgs shall show the <br />following information: <br />Bailed Plant: <br />I. Conduit quantity and type. <br />2- Coadmtdlstance: <br />w From permanent stmcto,. such as edge of <br />Pavement, sidewalk or curb <br />b. Other underground utilities (if known), <br />a Any above ground obsteeles or structures <br />(buildings, sidewalk, guard rail, utility poles, <br />guys and anchors, etc) <br />d. At ese, 50 if <br />3- Beginning and end station for all conduitnms. <br />4- Beginning and end station on all changes in the conduit <br />I)Te. <br />5- Offsets and station numbers at the beginning and end <br />of.] I inning line changes. <br />6. Any changes to the original design most be documented <br />in detail, including the reason for change, and the <br />person oho approved it, detail measurements and <br />station numbers throughout the change. <br />7- Depth ofcover eveq- 50 B and at all road crossing and <br />other utility crossings. <br />g- Hondhole /manhole dimensions, oIF -sets from <br />permanent sunwome, (edge of road, curb, sidewalk, <br />eta), and indicate if Bush mounted or buried. Show <br />depth of cover for all buried handholesyun holes. <br />9- The location .fall buried cable markers (show station <br />number). <br />10. Thelocationardtypeof GRANTBEhandholesand <br />manholes. (station number plus off -set) <br />❑- Thecable serial number al the beginning of the drawings <br />and at each side ofa splice Ioatio t, <br />12- The cable sequential numbers at every manholehandholes <br />and building mumares (if any) at each any point, <br />13- All road crossings most have apIn. and profile detailed <br />drawings, including but not limited to off-sets, depth of <br />cmaq and angle oCcrossing. <br />Aerial Plant: <br />1- The following information must be renfied at all to <br />attachments where possible: <br />a. Pole ownership <br />Is. Pole lD number <br />2- Attachment height for GRANTEE Fibers. <br />3- CPS coordinates for any new poles installed or used <br />which coordinates were not depicted on the <br />construction drawings. CPS coordinates must conform <br />to Mat NAD33. <br />4- Cable sequential number at each pole. <br />5- Cable sequential numbers at beginning and end of each <br />slack loop. <br />6- Cable serial number at the beginning ofthe drmvings <br />and at each side ofa splice hammer.. <br />7- Detailed drsring at all road, railroad, waterways, etc., <br />shoeing cable height at each side of the crossing. <br />Inside Plant <br />1- Building entry location by pmtiding a minimum oftem <br />offset measurements. <br />2- All rises, plenum pull box/ splice box size and <br />location Show offset measurements. <br />3- Utilization ofa separate detail drawing when needed to <br />avoid congested and legible as bui Its <br />4. The cable type mid serial number at the top ofesch <br />page. <br />5- The cable sequential numbers at all pull bases, splice <br />boxes at both entry points. <br />6 The cable sequential numbers at the beginning end end <br />.fall cable its len in the building. <br />Multiple <br />
The URL can be used to link to this page
Your browser does not support the video tag.