My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8814-15 Accept OH EPA grant for stream bank restoration and fish shelf
Document-Host
>
City of Lakewood
>
Resolutions
>
2015
>
8814-15 Accept OH EPA grant for stream bank restoration and fish shelf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2015 11:10:30 AM
Creation date
7/9/2015 11:10:19 AM
Metadata
Fields
Template:
Office Of Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW, THEREFORE, in consideration of the mutual promises herein contained, the DB and the <br />City hereby agree as follows: <br />ARTICLE 1. THE WORK. <br />The Design Builder ( "DB ") shall provide all work required by the Contract Documents (the <br />"Work. ")The Project is a pilot project with the objective to eliminate the sources of clean water <br />on private property from entering the City's sanitary sewer system. The purpose of the Project is <br />to initially evaluate the costs and benefits of such a program and the potential conducting of <br />similar projects citywide. Preliminary to the undertaking of the work of the DB, the City has <br />conducted and shall continue to conduct physical inspections of approximately 102 privately - <br />owned parcels ( "Individual Parcels ") located on Eldred Avenue, Delaware Avenue and Atkins <br />Avenue in order to assess the ability to reduce infiltration and inflow within the existing sanitary <br />sewer system. The Work of the DB shall include (but shall not be limited to) the assessment of <br />the City's individual inspection reports as to each Individual Parcel including review of pre - <br />construction videotapes and other data and information compiled by the City; design and <br />development of individual plans of repair and corrective action in order to address the <br />remediation of conditions and rehabilitation of each Individual Parcel. Thereafter , the DB shall <br />proceed to perform the Work in accordance with the plans and specifications generated by the DB <br />and pre - approved by the City related to each Individual Parcel. <br />This Davis Bacon Project will utilize the Design -Build ( "Design - Build ") project delivery method. <br />ARTICLE II. SCOPE OF SERVICES: PRESENTMENT OF PLANS AND <br />SPECIFICATIONS AND FIRM PRICE <br />The selected Design - Builder, as a portion of its required Scope of Services and its Work, will <br />discuss and clarify with the City the breakdown of the Project's detailed cost components; <br />address the City's Project requirements; and develop and ultimately refine the Project schedules <br />associated with the performance of the Work related to each Individual Parcel and the Project <br />overall. Project schedules shall be required to be revised, from time to time, and tendered to the <br />City for its review and approval on a periodic basis and in any event no less often than at each bi- <br />weekly job meeting undertaken or as otherwise directed and requested by the City. <br />When authorized to proceed in writing by the City with respect to the Work as to one or more <br />Individual Parcels, the DB shall proceed on a phased basis. <br />1. Initially, the DB shall proceed with a constructability review of the Individual Parcels <br />and shall provide comments and suggestions as to the City- provided inspection <br />reports, CCTV videos and logs and other documents produced by the City and/or the <br />21Page <br />Consulting Engineer address for notices is: <br />8150 Sterling Court <br />Mentor, Ohio 44060 <br />NOW, THEREFORE, in consideration of the mutual promises herein contained, the DB and the <br />City hereby agree as follows: <br />ARTICLE 1. THE WORK. <br />The Design Builder ( "DB ") shall provide all work required by the Contract Documents (the <br />"Work. ")The Project is a pilot project with the objective to eliminate the sources of clean water <br />on private property from entering the City's sanitary sewer system. The purpose of the Project is <br />to initially evaluate the costs and benefits of such a program and the potential conducting of <br />similar projects citywide. Preliminary to the undertaking of the work of the DB, the City has <br />conducted and shall continue to conduct physical inspections of approximately 102 privately - <br />owned parcels ( "Individual Parcels ") located on Eldred Avenue, Delaware Avenue and Atkins <br />Avenue in order to assess the ability to reduce infiltration and inflow within the existing sanitary <br />sewer system. The Work of the DB shall include (but shall not be limited to) the assessment of <br />the City's individual inspection reports as to each Individual Parcel including review of pre - <br />construction videotapes and other data and information compiled by the City; design and <br />development of individual plans of repair and corrective action in order to address the <br />remediation of conditions and rehabilitation of each Individual Parcel. Thereafter , the DB shall <br />proceed to perform the Work in accordance with the plans and specifications generated by the DB <br />and pre - approved by the City related to each Individual Parcel. <br />This Davis Bacon Project will utilize the Design -Build ( "Design - Build ") project delivery method. <br />ARTICLE II. SCOPE OF SERVICES: PRESENTMENT OF PLANS AND <br />SPECIFICATIONS AND FIRM PRICE <br />The selected Design - Builder, as a portion of its required Scope of Services and its Work, will <br />discuss and clarify with the City the breakdown of the Project's detailed cost components; <br />address the City's Project requirements; and develop and ultimately refine the Project schedules <br />associated with the performance of the Work related to each Individual Parcel and the Project <br />overall. Project schedules shall be required to be revised, from time to time, and tendered to the <br />City for its review and approval on a periodic basis and in any event no less often than at each bi- <br />weekly job meeting undertaken or as otherwise directed and requested by the City. <br />When authorized to proceed in writing by the City with respect to the Work as to one or more <br />Individual Parcels, the DB shall proceed on a phased basis. <br />1. Initially, the DB shall proceed with a constructability review of the Individual Parcels <br />and shall provide comments and suggestions as to the City- provided inspection <br />reports, CCTV videos and logs and other documents produced by the City and/or the <br />21Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.