Laserfiche WebLink
i <br />APPENDIX A <br />PROJECT DESCRIPTION AND COMPLETION SCHEDULE <br />1) PROJECT DESCRIPTION ( PHYSICAL SCOPE: <br />The Project, for which the provision of financial assistance is the subject of this Agreement, is hereby defined and <br />described as follows: <br />a) PROJECT NAME: Watermain Replacement 2016 <br />b) SPECIFIC LOCATION: This project takes place within existing right -of -way along the following streets: <br />Alameda Avenue, Detroit to Franklin; Lakeland Avenue, Madison to Athens; Morrison Avenue, Madison to <br />Athens; and, Robinwood Avenue, Madison to Lakewood High School. <br />(Project Location Zip Code - 44107 -) <br />c) PROJECT TYPE; MAJOR COMPONENTS: This project consists of water supply system improvements, <br />including replacement of water mains and service connections, installation of hydrants and appurtenances, <br />pavement replacement, erosion control, maintenance of traffic, site restoration. <br />d) PHYSICALDIMENSIONAL CHARACTERISTICS: Alameda Avenue: 1,475LF of 8-inch ductile iron cement <br />lined. Lakeland Avenue: 1,060 LF of 8 -inch ductile iron cement lined. Morrison Avenue: 1,000 LF of 8 -inch <br />ductile iron cement lined. Robinwood Avenue: 1,060 LF of 8 -inch ductile iron cement lined. Service <br />connections: 188 replacements. <br />