My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8937-17 Authorize Design-Build Contract for WWTP
Document-Host
>
City of Lakewood
>
Resolutions
>
2017
>
8937-17 Authorize Design-Build Contract for WWTP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 4:42:36 PM
Creation date
7/18/2017 4:42:03 PM
Metadata
Fields
Template:
Office Of Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Design Stage <br />• Basis of Design Study: The Basis of Design summary report will consist of a <br />brief description of each improvement element, the associated design parameters and <br />equipment design criteria. Design features of the plant process, electrical, mechanical <br />(HVAC and Plumbing), architectural, structural, instrumentation and control, and civil <br />site components will be listed. The design summary will also include project <br />constraints /limitations, coordination items, needed approvals, detailed opinion of project <br />cost and a schedule of critical design milestones. <br />During preparation of the Basis of Design study, the DB team shall hold a minimum of <br />three design workshops with the City. These workshops shall be used to ascertain the <br />City's concerns, preferences, and project specific operation and maintenance issues. <br />These workshops will also be used to substantiate the information on which the project <br />will be designed and constructed. Specific discussions will include: equipment selection, <br />upgrades of existing facilities including OBC issues, operational considerations, <br />construction methods, design guidelines to be followed, cost impacts and schedule <br />impacts. The Basis of Design stage will be considered complete upon the City's <br />acceptance of the Basis of Design report. <br />• Preliminary Design: Preliminary design drawings will be produced after the <br />Basis of Design has been accepted by the Owner. Preliminary design deliverables will <br />include plan layout of the plant structures/buildings and process equipment. Major <br />section drawings for plant improvements will be prepared during the preliminary design <br />as necessary. Other plant design drawings initiated during the preliminary design will be <br />process schematics, and a baseline instrumentation and control schematic. <br />• The completion of the Preliminary Design work constitutes approximately 15% of <br />the overall design. <br />Design Development Stage <br />• Design Development Stage work will be produced after the Preliminary Design <br />has been accepted by the Owner. Design Development Stage deliverables shall be <br />submitted to the City Engineer and the Criteria Engineer (as the City directs) by the DB <br />through the FOR at the completion of the following: <br />30% completion of design stage; and, <br />60% of completion of design stage <br />Design Development Stage deliverables at each stage shall take into account and address: <br />6 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.