My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8944-17 Ratify Agreement with Local 1043, AFL-CIO & OH Council 8, AFSCME
Document-Host
>
City of Lakewood
>
Resolutions
>
2017
>
8944-17 Ratify Agreement with Local 1043, AFL-CIO & OH Council 8, AFSCME
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 4:57:32 PM
Creation date
7/18/2017 4:56:24 PM
Metadata
Fields
Template:
Office Of Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Investigations and analyses of existing site, structures, equipment, <br />processes, and operations; <br />• Plans, sections, elevations, typical construction details, and equipment <br />layouts that illustrate and describe the refinement of the Project's design <br />and the size and character of the Project in terms of architectural, <br />structural, mechanical, plumbing, and electrical systems, materials, and <br />other elements as may be appropriate; <br />• Specifications sufficient to identify the quality and other characteristics of <br />the proposed or selected materials, equipment, finishes, fixtures, and <br />systems; <br />• Projected energy recovery calculations; and <br />• A written description of all proposed modifications of the City's Goals <br />and Objectives, and resolutions to all issues related to permitting (both <br />construction related and operational). <br />There shall be review meetings with the City at each stage. <br />All plans, specifications, design documents and other documents required to be generated <br />and/or submitted to the City are subject to City review whereafter, upon approval of the City <br />Engineer, the DB shall undertake the performance of the next phase or stage of Work identified <br />by the City in accordance with the City's pre- approved schedule and upon issuance of an <br />Authorization to Proceed by the City as noted within these Contract Documents. <br />In the event the plans and specifications tendered for review by the City Engineer and <br />permitting agencies are unacceptable and/or require revisions, the FOR shall undertake such <br />revisions and modifications as required on a timely basis and in accordance with the directives <br />and /or instructions and /or suggestions of the City Engineer and /or the Criteria Engineer. <br />Provided, however, no such directives, instructions or suggestions of the City Engineer and/or <br />the Criteria Engineer shall constitute assumption of nor relieve the DB or the FOR from any of <br />the express duties and responsibilities set forth within this Agreement. <br />In furtherance of the above, the City may call and require attendance of identified DB and <br />FOR representatives for review meetings at each stage or at any other time as the City elects. <br />Upon approval of all Design Development Stage deliverables (i.e., the Basis of Design, <br />Preliminary Design, 30 %, and 60 % design stages above - noted), the FOR shall generate the <br />final design documents for the Project. The EOR's deliverables shall include: <br />Drawings setting forth in detail the requirements for the construction of the <br />Project; <br />7 iPage _ __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.