Laserfiche WebLink
Amended Addendum A- GMP/Fixed Price <br />Date of Issuance of this Addendum by DB: June 22, 2018 <br />The DB proposes the following alternatives: <br />A. Alternate #1: A Fixed Price for the entirety of DB's Work in respect to the Construction <br />Stage of the Project in the amount of: <br />$ 7,979,400.00 <br />B. Alternate #2: A Guaranteed Maximum Price ( "GMP ") in respect to the Construction <br />Stage: <br />A not -to exceed amount for the Construction Stage Cost of the Work <br />$ 8,055,400.00 <br />This figure shall be the Guaranteed Maximum Price (GMP), which we hereby guarantee to the <br />City of Lakewood. <br />In respect to the GMP, same shall be calculated as per the following page of this Agreement. <br />PROPOSED BY THE DB <br />Kokosing Industrial Inc. <br />(Name of Firm) <br />By: - - - -- j r— <br />(Signature) <br />VICc PRESIh�r�Y <br />(Printed Name) G9&U J_fthAK <br />Date of DB Proposal: (� f <br />221Page <br />