My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
mincow 06-03-19
Document-Host
>
City of Lakewood
>
Committee Minutes
>
2019
>
Committee of the Whole
>
mincow 06-03-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 10:44:06 AM
Creation date
6/11/2019 10:25:49 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Committee of the Whole
Date
6/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o Will continue to work on details. <br /> * Will the service area on the Marlowe side remain open? <br /> o Could be a gate/door; will add plantings. <br /> * What about the streetscape along Marlowe Avenue? <br /> o Maple and elm trees are planned (minimum will be no less than 3 inches in caliper; conversation with the City is <br /> ongoing about continuing this condition to Franklin). <br /> * Will there be a sound system for the plaza? <br /> o One is being planned. <br /> * Will the water feature conflict with other sounds? <br /> o There will not be a large enough flow of water to cause a problem; a shutoff valve would be incorporated into the <br /> operation of the system. <br /> Additional members" comments were: <br /> * Identify the primary entry and emphasize it in the hierarchy. <br /> * Add/finish the top of the building pieces. <br /> * Pay attention to the scale of the windows. <br /> * <br /> Do not lose all of the civic feeling of the front facade. <br /> * Opportunity exists for an outstanding feature. <br /> * What is the timing for the Curtis Block building? <br /> o No date has been established for its design; it's a major component and will be examined further once the retail and <br /> commercial portions of the project are more fully defined. <br /> *The transition between the building and the winter garden is much improved. <br /> The applicant sought clarity on the residential side to assist with the fast-tracking for the civil engineering of the garage. <br /> Staff identified the portions of the project. The members answered to the affirmative. <br /> The applicant wanted to know what plaza amenities would be approved,so that prospective tenants could be advised of <br /> them. The members were comfortable with the design intent of what had been presented, but the arrangement of the <br /> elements needs refinement. <br /> A motion was made by Ms, Haney,seconded by Mr. Waddellto DEFER until the meeting in May. All of the members <br /> voting yea,the motion passed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.