Laserfiche WebLink
occurs during the Term and impacts the ability of the System to deliver electricity to the Delivery Point, the <br />Term will be extended day for day for each day delivery is suspended due to the Force Majeure Event. <br />ii. Extended Force Mae eure. If a Force Majeure Event notified by either Party under paragraph (i) above continues <br />for a consecutive period of one hundred eighty (180) days or more within a twelve (12) month period, then <br />either Party may terminate this Agreement without either Party having further liability under this Agreement <br />except: (a) liabilities accrued prior to termination, (b) Seller shall remove the System as required under Section <br />9 (but Purchaser shall reimburse Seller for Seller's removal costs if the Force Majeure Event affects Purchaser <br />and Purchaser elects to terminate the Agreement) and (b) if Purchaser elects to terminate the Agreement in <br />accordance with this Section, Purchaser shall pay the applicable Termination Payment. Notwithstanding the <br />foregoing, if the Force Majeure Event can be corrected through repair or restoration of the System or other <br />actions by Seller and, prior to expiration of the initial one hundred eighty (180) -day period, Seller provides <br />written evidence to Purchaser that it is diligently pursuing such actions, then Purchaser shall not have the right <br />to terminate this Agreement so long as Seller continues to diligently pursue such actions. <br />iii. "Force Maieure Event" means any event or circumstance beyond the reasonable control of and without the <br />fault or negligence of Seller, including, without limitation, failure or interruption of the production, delivery or <br />acceptance of electricity due to: an act of god; war (declared or undeclared); sabotage; piracy; riot; insurrection; <br />civil unrest or disturbance; military or guerilla action; terrorism; economic sanction or embargo; civil strike, <br />work stoppage, slow -down, or lock -out; explosion; fire; earthquake; abnormal weather condition or actions of <br />the elements; hurricane; flood; lightning; wind; drought; animals; the binding order of any Governmental <br />Authority; the failure to act on the part of any Governmental Authority (including, without limitation delays in <br />permitting not caused by actions or omissions ofthe Party seeking such permit); unavailability of electricity from <br />the utility grid; and failure or unavailability of equipment, supplies or products outside of Seller's control or due <br />to a Force Majeure Event. <br />e. Extension of Time. If Seller is delayed in achieving Commencement of Installation due to a Force Majeure Event, <br />the time for achievement of Commencement of Installation will be automatically extended to account for the impact <br />of the delay. <br />Commercial Operation. Seller shall notify Purchaser in writing when it has achieved Commercial Operation (the <br />date of such notice, the "Commercial Operation Date"). "Commercial Operation" means that the System is <br />mechanically complete, capable of providing electricity to the Delivery Point at the nameplate capacity specified in <br />Exhibit 2 and has permission to operate from the relevant Governmental Authority. Seller shall provide Purchaser <br />with documentation to evidence that the System is ready to begin Commercial Operation upon Purchaser's reasonable <br />request. <br />6. Installation, Operation and Maintenance. <br />a. Seller's General Obligations Regarding the System. Subject to the terms and conditions of this Agreement, Seller <br />shall design, engineer, install, commission, monitor, operate and maintain the System, in each case in a good and <br />workmanlike manner and in accordance with applicable law and prudent solar industry practices in the state in which <br />the Premises are located. The System shall comply with all applicable rules, regulation and local building codes. <br />b. System Design Approval. Seller shall provide Purchaser with a copy of the System design for approval prior to <br />commencement of construction. Purchaser shall have ten (10) days after receipt to approve or disapprove the design. <br />Failure by Purchaser to respond within such ten (10) day period shall be deemed approval of the design. If Purchaser <br />disapproves the design, Seller shall modify the design and resubmit it for Purchaser's approval. If the System design <br />modifications requested by Purchaser render the System non-viable, Seller may terminate this Agreement under <br />Section 2(c) above. <br />C. System Repair and Maintenance. Seller may suspend delivery of electricity fi-om the System to the Delivery Point <br />for the purpose of maintaining and repairing the System; provided that Seller shall use commercially reasonable efforts <br />to (i) minimize any interruption in service to the Purchaser, and (ii) limit any such suspension of service to weekend <br />or off-peak hours. Scheduled and unscheduled maintenance and repairs shall be undertaken at Seller's sole cost and <br />expense, except that Purchaser shall reimburse Seller for the reasonable cost of any repairs or maintenance resulting <br />from damage caused by Purchaser, its agents, employees or contractors. <br />(7794548:) SEIA C&I PPA, version 2.0 <br />Exh. 3, p. 3 <br />