My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01 - Purchase Agreement with Enerlogics Solar LLC
Document-Host
>
City of Lakewood
>
Resolutions
>
2019
>
2019-01 - Purchase Agreement with Enerlogics Solar LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 9:53:54 AM
Creation date
11/12/2019 9:06:37 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
Number
2019-01
Date Adopted
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Contract Price Assumptions. The Contract Price is based on the following assumptions: <br />a. A payment or performance bond is not being issued to Purchaser under this Agreement. <br />b. Interconnection costs for the System will not exceed $15,000 in the aggregate. <br />c. Statutory prevailing wage rates (e.g., Davis -Bacon) do apply. <br />d. A Performance Guaranty is being provided. <br />e. All prices in this Agreement are calculated based on an upfront rebate of $0. <br />L The Contract Price is inclusive of Seller's Taxes (as defined in Section 3(d) of Exhibit 3 at the rates in effect as of the <br />Effective Date (to the extent that such rates are known or knowable by Seller on the Effective Date). <br />7. Contract Price Exclusions. Unless Seller and Purchaser have agreed otherwise in writing, and except as otherwise provided in <br />Section 2(c) of Exhibit 3, the Contract Price excludes the following: <br />a. Unforeseen groundwork (including excavation and circumvention of underground obstacles). Upgrades or repair to customer <br />or utility electrical infrastructure (including: client or utility service, transformers, substations, poles, breakers, reclosers, and <br />disconnects). <br />b. Snow removal, tree removal, tree trimming, mowing and any landscape improvements. <br />c. Decorative fencing and/or any visual screening materials, decorative enhancements to solar support structures (including: <br />painting, paint matching, masonry/stone work, and any lighting not required to meet the minimum code compliance). <br />d. Removal of existing lighting, light poles, or concrete light post bases. <br />c. Roof membrane maintenance or reroofing work. <br />L Structural upgrades to the Improvements, including ADA upgrades. <br />g. Installation of public information screen or kiosk (including accompanying internet connection, power supply, technical <br />support and ADA access). <br />h. Changes in System design caused by any inaccuracy or ambiguity in information provided by Purchaser, including <br />information regarding Purchaser's energy use, the Premises and the Improvements, including building plans and <br />specifications. <br />(7794548:) SEIA C&I PPA, version 2.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.