Laserfiche WebLink
12/6/2019 <br /> Public Open House— November 19, 2019 <br /> Beck Center has embarked on a$5.71M Capital Campaign <br /> Part of the renovations will include the demolition of the Annex <br /> Beck Center for the Arts building on the corner of Rockway and Detroit Ave. <br /> A greenspace will be created <br /> Proposed Greenspace Proposal The public was asked to provide input and feedback of what they <br /> wanted to see in the public greenspace <br /> Over 50 members of the community attended,including council <br /> members,patrons,parents,donors,and friends of Beck Center <br /> Public Feedback on proposed greenspace <br /> rr <br /> •Native Plantings and Ornamental Trees(31 votes) a ) i" <br /> •Circular Plazas and Perimeter Walls(29 votes) � Cr <br /> i� <br /> •Music Themed Site Furnishings(28) <br /> •Art Sculpture Inspiration(27) <br /> •Sculptural/artistic seating options(15) ��� ' <br /> •Pathways and Pedestrian Lighting(10) th <br /> •Donor Recognition(S) rn <br /> •Decorative crosswalks(4) <br /> •Ornamental and Decorative Fences(3) <br /> •Benches(1) <br /> v Ilop—K I IIH A— CORNERPARK=CERT <br /> RLhN <br /> 1 <br />