My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
minpw 11-4-19
Document-Host
>
City of Lakewood
>
Committee Minutes
>
2019
>
Public Works
>
minpw 11-4-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 10:41:36 AM
Creation date
3/3/2020 10:41:08 AM
Metadata
Fields
Template:
Office Of Council
Document Type
Public Works
Date
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Contract Price Assumptions.The Contract Price is based on the following assumptions: <br /> a. A payment or performance bond is not being issued to Purchaser under this Agreement. <br /> b. Interconnection costs for the System will not exceed$15,000 in the aggregate. <br /> c. Statutory prevailing wage rates(e.g.,Davis-Bacon)do apply. <br /> d. A Performance Guaranty is being provided. <br /> e. All prices in this Agreement are calculated based on an upfront rebate of$0. <br /> L The Contract Price is inclusive of Seller's Taxes (as defined in Section 3(d)of Exhibit 3) at the rates in effect as of the <br /> Effective Date(to the extent that such rates are known or knowable by Seller on the Effective Date). <br /> 7. Contract Price Exclusions. Unless Seller and Purchaser have agreed otherwise in writing, and except as otherwise provided in <br /> Section 2(c)of Exhibit 3,the Contract Price excludes the following: <br /> a. Unforeseen groundwork(including excavation and circumvention of underground obstacles).Upgrades or repair to customer <br /> or utility electrical infrastructure (including: client or utility service,transformers, substations,poles,breakers,reclosers, and <br /> disconnects). <br /> b. Snow removal,tree removal,tree trimming,mowing and any landscape improvements. <br /> c. Decorative fencing and/or any visual screening materials,decorative enhancements to solar support structures(including: <br /> painting,paint matching,masonry/stone work,and any lighting not required to meet the minimum code compliance). <br /> d. Removal of existing lighting,light poles,or concrete light post bases. <br /> e. Roof membrane maintenance or reroofing work. <br /> L Structural upgrades to the Improvements,including ADA upgrades. <br /> g. Installation of public information screen or kiosk(including accompanying internet connection,power supply,technical <br /> support and ADA access). <br /> h. Changes in System design caused by any inaccuracy or ambiguity in information provided by Purchaser, including <br /> information regarding Purchaser's energy use, the Premises and the Improvements, including building plans and <br /> specifications. <br /> {7794548:1 SEIA C&I PPA,version 2.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.