Builder, Architect, consultants, Contractors, material suppliers, or other persons or entities entitled to make a claim
<br />by reason of having provided labor, materials and equipment relating to the Work.
<br />§ 9.4 Certificates for Payment
<br />The Owner shall, within seven days after receipt of the Design -Builder's Application for Payment, issue to the
<br />Design -Builder a Certificate for Payment indicating the amount the Owner determines is properly due, and notify
<br />the Design -Builder in writing of the Owner's reasons for withholding certification in whole in part as provided in
<br />Section 9.5.1.
<br />§ 9.5 Decisions to Withhold Certification
<br />§ 9.5.1 The Owner may withhold a Certificate for Payment in whole or in part to the extent r,'easonably!..necessary to
<br />protect the Owner due to the Owner's determination that the Work has not progressed to t 'heoiritnidicated in the
<br />I
<br />Design -Builder's Application for Payment, or the quality of the Work is not in accordance WH -Build
<br />th the Design
<br />Documents. If the Owner is unable to certify payment in the amount of the Application, the Pweer will notify the
<br />Design -Builder as provided in Section 9.4. If the Design -Builder and Owner cannot agree oil revised amount, the
<br />Owner will promptly issue a Certificate for Payment for the amount that the Owner deems to,,.,.be due and owing. The
<br />Owner may also withhold a Certificate for Payment or, because of subsequently discovered bvidrice, may nullify
<br />the whole or a part of a Certificate for Payment previously issued to such extent as may be repesp.,ry to protect the
<br />Owner from loss for which the Design -Builder is responsible because of
<br />13.
<br />.1 defective Work, including design and construction,, not remedied;
<br />.2 third party claims filed or reasonable evidence indicating probable filing of such cl4ims unless security
<br />acceptable to the Owner is provided by the Design -Builder;
<br />.3 failure of the Design -Builder to make payments properly to the Architect, Consultants, Contractors or
<br />others, for services, labor, materials or equipment;
<br />.4 reasonable evidence that the Work cannot be completed for the unpaid balance of the Co,, #tract Sum;
<br />.5 damage to the Owner or a separate contractor;
<br />.6 reasonable evidence that the Work will not be completed within the Contract Time Ancf that the unpaid
<br />balance would not be adequate to cover actual or liquidated damages for the an ui,6ip e delay; or
<br />.7 repeated failure to carry out the Work in accordance with the Design -Build Do"
<br />§ 9.5.2 When the above reasons for withholding certification are removed, certification will be niatl for amounts
<br />previously withheld.
<br />§ 9.5.3 If the Owner withholds certification for payment under Section 9.5.1.3, the Owner may, at it§.-:1,..,s.6le option,
<br />issue joint checks to the Design -Builder and to the Architect or any Consultants, Contractor, material or equipment
<br />suppliers, or other persons or entities providing services or work for the Design -Builder to who m. the-,-::Design-Builder
<br />failed to make payment for Work properly performed or material or equipment suitably delivered'
<br />§ 9.6 Progress Payments
<br />§ 9.6.1 After the Owner has issued a Certificate for Payment, the Owner shall make payment.., t.
<br />manner and
<br />within the time provided in the Design -Build Documents.
<br />§ 9.6.2 The Design -Builder shall pay each Architect, Consultant, Contractor, and other person orJi6 tittyy-providing
<br />services or work for the Design -Builder no later than the time period required by applicable haw, but *in no event
<br />more than seven days after receipt of payment from the Owner the amount to which the Architect,t, bnsultant)
<br />Contractor, and other person or entity providing services or work for the Design -Builder is entitled, reflecting
<br />percentages actually retained from payments to the Design -Builder on account of the portion G..f'the :`Work performed
<br />by the Architect, Consultant, Contractor, or other person or entity. The Design -Builder shall,, by,zPprbpriate
<br />agreement with each Architect, Consultant, Contractor, and other person or entity providing icesor work for the
<br />Design -Builder, require each Architect, Consultant, Contractor, and other person or entity providing services or
<br />work for the Design -Builder to make payments to subconsultants and subcontractors in a similar manner.
<br />of completion
<br />§ 9.6.3 The Owner will, on request and if practicable, furnish to the Architect, a Consultant, ntracto,
<br />p fj aor other
<br />person or entity providing services or work for the Design -Builder, information regarding e-nta-g-.E..,�§ I
<br />or amounts applied for by the Design -Builder and action taken thereon by the Owner on account of portions of the
<br />Work done by such Architect, Consultant, Contractor or other person or entity providing services or work for the
<br />Design -Builder.
<br />AIA Document A1411 - 2014. Copyright © 2004 and 2014 by The American Institute of Architects. All rights reserved. WARNING: This AIAO
<br />Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, 21
<br />or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the
<br />law. This draft was produced by AIA software at 13:59:58 ET on 04/09/2020 under Order No. 3456073873 which expires on 04/04/2021, and is
<br />not for resale.