Laserfiche WebLink
§ A.1.4.3.3 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the <br />Design -Build Documents and are hereby accepted by the Owner: <br />(State the numbers or other identification of accepted alternates. If the Owner is permitted to accept other alternates <br />subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the change in the <br />Cost of the Work and Guaranteed Maximum Price for each and the deadline by which the 41t& ate must be <br />accepted.) <br />§ A.1.5 Payments <br />§ A.1.5.1 Progress Payments <br />§ A.1.5.1.1 Based upon Applications for Payment submitted to the Owner by the Design-Buitiler. the Ownerhall::nake <br />progress payments on account of the Contract Sum to the Design -Builder as provided below and elsewhere in the <br />Design -Build Documents. <br />§ A.1.5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the -last day of.... <br />the month, or as follows: <br />.. .. .......... .......... . .... <br />.... ..... ................ <br />rr <br />§ A. 1.5.1.3 Provided that an Application for Payment is received not later than t Formatted: Highlight <br />shall make payment of the certified amount to the Design -Builder not later thanthe last } da of the1}tn Formatted: Highlight <br />month. If an Application for Payment is received by the Owner after the application date fixed above, payment shall be�� <br />the Owner receives the A <br />made by the Owner not later than,<< .ft_ pplication for P4Yq1qTq... .... .... ... <br />Formatted: Highlight <br />(Federal, state or local laws may require payment within a certain period oftime) NY, Formatted: Highlight <br />............................ ............... .................................................................................................. <br />§ A.1.5.1.4 With each Application for Payment where the Contract Sum is based upon the Cost of We w6il�., or the <br />. . Formatted: Highlight <br />. . ... . .. . . . .... . ....... . . ..... . ...... . .... . . ........ . .................. . ........... . .. . .. . .. . ............... <br />of the Work with a Guaranteed Maximum Price, the Desip-Builder shall submit payrolls, <br />...... <br />Formatted: Strikethrough <br />,gonsuffltarits Tier invoices yedelief-s receipted Ar'chAec-f,4"nd' �a6dLiibc* 'o-'n*t-r-a-c-to��t��6d���'6�Lj�ii-A <br />. . ............... ........................................................................................................................................................... <br />Formatted: Highlight <br />and any other evidence required by the Owner to demonstrate that cash disbursements already' made L6f',_f6b6,' <br />. ......... ........... ........... ........... . ............................................................... ................................... ................. <br />Formatted: Highlight <br />the Design -Builder on account of the Cost of the Work equal or exceed (1) progress payments alrieady received tv the <br />Design -Builder, less (2) that portion of those payments attributable to the Design -Builders Fee; plw,,Q_.).. payfoll <br />........................................................................................... . ............................................................................ <br />..........Formatted: Strikethrough <br />the period covered by the present Application for Payment. .. ..................... . . ....................... . ....... .......... <br />Formatted: Highlight <br />§ A.1.5.1.5 With each Application for Payment where the Contract Sum is based upon a Stipulated Sum or Cost of the <br />Work with a Guaranteed Maximum Price, the Design -Builder shall submit the most recent schedule of.,valtie <br />accordance with the Design -Build Documents. The schedule of values shall allocate the entire Contract Sumamong e _rig th <br />various portions of the Work. Compensation for design services, if any, shall be shown separatelyWhere the Contract <br />Sum is based on the Cost of the Work with a Guaranteed Maximum Price, the Design -Builders F e' shall be shown <br />separately. The schedule of values shall be prepared in such form and supported by such data.10 s p-bstantiate its <br />accuracy as the Owner may require. This schedule of values, unless objected to by the Owner; as shdll be used a basis <br />for reviewing the Design -Builder's Applications for Payment. <br />. . . . ... § A. 1.5.1.6 In taking action on the Design -Builder's Applications for Payment, the Owner shall be entitled to rely on <br />the accuracy and completeness of the information furnished by the Design -Builder and shall <br />made a detailed examination, audit or arithmetic verification of the documentation submitted in accordance with <br />AIA Document A1412K - 2014 Exhibit A. Copyright © 2004 and 2014 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA'' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' <br />Document, or any portion of it, may result in severe civil and criminal penalties, and will he prosecuted to the maximum extent possible 3 <br />under the law. This draft was produced by AIA software at 06:51:30 ET on 04/14/2020 under order No.6771434791 which expires on 03/06/2021, <br />and is not for resale. <br />User Notes: (1345484614) <br />