My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-26 - Approve Design Build of Cove Church
Document-Host
>
City of Lakewood
>
Resolutions
>
2020
>
2020-26 - Approve Design Build of Cove Church
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 9:36:22 PM
Creation date
9/28/2020 7:00:26 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
Number
2020-26
Date Adopted
9/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D <br />SCOPE OF WORK AND PROJECT INFORMATION <br />1. Pro ° ect The Proj ect is the proj ect known as the City of Lakewood's Intergenerational Community Center, <br />as more particularly described in the Request for Qualifications (RFQ) and Request for Proposals (RFP) for <br />the Project. [See attached RFQand RFP.] <br />2. Initial Drawings The initial Drawings (prepared by the city) upon which the finalDrawings (prepared by <br />the Architect) will be based. [See item 5 below.] <br />3. Initial Specifications The initial Specifications (prepared by the city) upon which the final Specifications <br />(prepared by the Architect) will be based. [See item 5 below.] <br />4. Technical Criteria The technical criteria upon which the final Drawings and Specifications will be based <br />include all technical criteria listed in the RFP. [See item 5 below.] <br />5. List of items 2-4 as described above <br />a. DOHS Programming Matrix <br />b. Preliminary Cove Church Fit Plans <br />c. DOHS Supplementary Programming <br />d. Existing Drawings Cove Church <br />e. Historical Construction Documents <br />i. Study of Heating System <br />ii. Original General Building Specifications <br />f. Hazardous Materials Abatement <br />i. #42564 Lakewood Cove Church Spec, prepared by EA Group <br />ii. #42564 Lakewood Cove Church Bid Form, prepared by EA Group <br />6. City of Lakewood Requirements The Procurement and Contracting Requirements and the General <br />Requirements are those documents included with the RFP. <br />7. City of Lakewood Insurance Requirements <br />8. Addenda The Addenda areas follows: <br />a. Design -Builder Proposal - Concept drawing <br />b. Design -Builder Proposal— Bid Packaging Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.