2020-26 - Approve Design Build of Cove Church
Document-Host
>
City of Lakewood
>
Resolutions
>
2020
>
2020-26 - Approve Design Build of Cove Church
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 9:36:22 PM
Creation date
9/28/2020 7:00:26 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Resolutions
Number
2020-26
Date Adopted
9/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Formatted: Strikethrough <br />§ A.1.5.4 Progress Payments —Cost of the Work Plus a Fee with a Guaranteed Maximum Price <br />§ A.1.5.4.1 Applications for Payment where the Contract Sum is based upon the Cost of the Work Plus a Fee with a <br />Guaranteed Maximum Price shall show the percentage of completion of each portion of the W.' ork as of the dnd of the <br />period covered by the Application for Payment. The percentage of completion shall be the lesser Of (1) the percentage <br />of that portion of the Work which has actually been completed; or (2) the percentage obtained by dividing (a) th6 <br />expense that has actually been incurred by the Design -Builder on account of that portion of the Work for which the <br />Design -Builder has made or intends to make actual payment prior to the next Application for meat` �,_N"" ' the"shale "`�°°`+` <br />P Y P PP Y� Y �� <br />of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values.. n:.... r:> ........ ».. <br />§ A.1.5.4.2 Subject to other provisions of the Design -Build Documents, the amount of each progress payment shall <br />be computed as follows: <br />} <br />.1 <br />Take that portion of the Guaranteed Maximum Price properly allocable to completed Work as <br />determined by multiplying the percentage of completion of each portion of the Work by the share, of <br />the Guaranteed Maximum Price allocated to that portion of the Work in the sch:6dule.:Q.fwgues. <br />Pending final determination of cost to the Owner of changes in the Work, amounfs�notan dispute shall <br />be included as provided in Section 6.3.9 of the Agreement. <br />.2 <br />Add that portion of the Guaranteed Maximum Price properly allocable to materials and *equipment <br />delivered and suitably stored at the site for subsequent incorporation in the Work, or if approve'F^tn <br />advance by the Owner, suitably stored off the site at a location agreed.upon in writing; <br />.3 <br />Add the Design -Builder's Fee, less retainage of j ie�1 percents c i U_y %)_ The Desk -Builder's Fee_ <br />_ Formatted: Highlight <br />shall be computed upon the Cost of the Work at the rate stated in Section A.1.4 2 or,fi-f-tlte Design- <br />"N <br />v Formatted: Highlight <br />Builder's Fee is stated as a fixed sum in that Section, shall be an amount that beam the same rat1Q to that ` <br />fixed -sum fee as the Cost of the Work bears to a reasonable estimate of the probable Bost of the WQtk <br />s <br />upon its completion, <br />..... _a..... <br />.4 <br />Subtract retainage of percent (« 10 >i %) from that portion of the Work that the_Desikn Blunder <br />_..-.._........ _..... __............... _.. ........ _ .....__.._.._... _...... _............... ............... <br />; -_ - -� Formatted: Highlight <br />self -performs; <br />Formatted Highlight <br />.5 <br />Subtract the aggregate of previous payments made by the Owner; <br />.6 <br />Subtract the shortfall, if any, indicated by the Design -Builder in the documenfatiau requuedr b y f,:<f <br />Section A.1.5.1.4 to substantiate prior Applications for Payment, or resulting from errors subsequently <br />discovered by the Owner's auditors in such documentation; and <br />.7 <br />Subtract amounts, if any, for which the Owner has withheld or nullified a payment as provided in <br />Section 9.5 of the Agreement. <br />§ A.1.5.4.3 The Owner and Design -Builder shall agree upon (1) a mutually acceptable proc <br />approval of payments to the Architect, Consultants, and Contractors and (2) the percentage <br />agreements with the Architect, Consultants, and Contractors; and the Design -Builder shall <br />accordance with those terms. <br />t .. <br />lure fpr"teview and'"*'""""""--........,.,., <br />5f rotainage held on <br />xedute agreements in <br />§ A.1.5.5 Final Payment <br />§ A.1.5.5.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shallbe made by the Owner to ..r. i <br />the Design -Builder not later than 30 days after the Design -Builder has fully performed the Co�rtraet arrdrtheN. r>:r> - tr <br />requirements of Section 9.10 of the Agreement have been satisfied, except for the Design -Builder's responsibility to <br />AIA Document A141"' — 2014 Exhibit A. Copyright © 2004 and 2014 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AS.A" 5 <br />Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible <br />under the law. This draft was produced by AIA software at 06:51:30 ET on 04/14/2020 under Order No.6771434791 which expires on 03/06/2021, <br />and is not for resale. <br />User Notes: (1345484614) <br />
The URL can be used to link to this page
Your browser does not support the video tag.