My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
minpws-fin 07-06-21
Document-Host
>
City of Lakewood
>
Committee Minutes
>
2021
>
Public Works
>
minpws-fin 07-06-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2021 12:20:09 PM
Creation date
7/23/2021 12:19:09 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Public Works
Date
7/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Councilmember Shachner inquired whether the current water rate was not sustainable due to <br /> people using less water. Mr. McMahon noted that nationwide, utilities are seeing a 24% decline <br /> in water usage annually per capita. Joe Crea noted that the declines have begun to level out over <br /> the last 6 years, and that the industry will begin to levelized soon. <br /> Engineer Papke reviewed improvements Lakewood has made over the past 10 years and the $60 <br /> million dollars of investment already put into the project. The Public Works Department has <br /> been working to separate the sanitary and overflow sewers throughout the city while completing <br /> street repairs. The city's high rate treatment facility is ahead of schedule in the construction <br /> process and should open in the fall. <br /> The current IWWIP plan requires $247 million in capital expenditures. Operational and staffing <br /> needs are likely to accompany that capital investment. A trial period of one year will occur at the <br /> high rate treatment plant with the use of existing staffing. <br /> Councilmember Kepple questioned whether the project team considered global warming factors <br /> in its analysis. The team indicated those factors are built into the analysis, and how they affect <br /> the system requires the city's plan to remain flexible. <br /> Councilmember Shachner asked, absent the $25 million in funding from ARPA, how the IWWIP <br /> proposal would be funded. Mr. McMahon & Mr. Crea indicated that it would be funded with the <br /> rates on the books currently, with a likely 10% increase in water rates each year, continuing on a <br /> consumption basis. <br /> Councilmember Rader stated that he is not yet comfortable with decreasing the water rate of <br /> industrial users proposed in the IWWIP and needed further clarification. <br /> Mayor George spoke to the $43 million Lakewood would be receiving from ARPA, and how $25 <br /> million of it is being proposed to be put toward Clean Water Lakewood. She stated that its use <br /> would bring down the current approved rates for every person in Lakewood in 2022 & 2023. <br /> Mr. Crea explained the sewer capital needs, highlighting the miles of sewer and water pipes that <br /> need to be fixed along with the wastewater treatment plant. He further elaborated on how the <br /> system can be changed to recover costs via an impervious surface fee, which helps the city to not <br /> rely on water usage. He explained how the impervious surface fee is calculated based on the use <br /> of equivalent residential units (ERUs). Most residential customers in Lakewood have a <br /> homogenous water/sewer footprint due to similar lot sizes. All residential ERUs would pay <br /> $2/month, with commercial properties paying $2 per ERU that fits on the property. <br /> Mr. McMahon explained the use of potential credit systems to be considered and implemented in <br /> the future. <br /> Co-Chair Rader recognized members of the Tree Education and Advisory Board(TEAB) and <br /> invited them to speak. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.