Laserfiche WebLink
Lakewood auiupka the taillowi,n .whedualc ofAN'WIP mcisurcs: <br /> L 2,0119-2(11,213 <br /> � WrnmmW <br /> • Continue all ongoing activities. <br /> • Complete <br /> is rixterpulotsudand evaluate the cost-effectiveness and <br /> prioritization aprivate,infrastructure "' yu <br /> i <br /> i <br /> u <br /> t <br /> E�walaiata rcwawccil rakc alrnaauarc tca i,nc;lmcic li,*a,cd fc�c�lyargc andhyr aayxpycmwauama-suarl�ucc u:h,argc <br /> �, aaucf crc.al:t cdr aauccntiwc rcgitruc. <br /> 2 ■ Comfaluak,c West(."Itflwan and:aathcr lCcgulaktar hiiprcavemenk Prue ck,s. <br /> wW ■ Comfalctc `W23 million tlligh lcakc lrcakayxcnt Facility for control catC'.SOOJ012. <br /> ■ C omplctc cilcsign ofBundle 1 work for CSO,052 storage facility and aerial sewer. <br /> • Evaluate land uaac requirements tar CSO 059 control measure and related land use opportuni- <br /> ties and cw,i:sting facility inwcsm-lent. <br /> ■ Complete 1WW"aw"1tIP Update by December 31,2021, <br /> 2... 2024-20,28 tvny,, <br /> ■ Continue all ongrwing actavitics(and any additional n,ngtwing m asures,adopted in 2011 9-20D), <br /> ), <br /> WWW "W "W <br /> W W m • Construct Bundle: 1 C'S(:'9a 052 storage Facility RltES l I60-1165: Aerial Sewer to Above <br /> Ground.Storage at WW"WTP.Controlled to 4 untreated C S0s'per typical,year. <br /> ■ Comfalctc cilesign work for Bundle 2„C'SO 0159 and related interceptor overfloww sto age fia,cil,i- <br /> t:ie w. <br /> ■ Complete lW4"WW"lfaUpdate by becember 31,2027, <br />