Laserfiche WebLink
U�� d�IP�6 IU��,)s �4s�h � �h�DI � 1161,N�f�ui 111(:',T I i�'u.I i�u..0 i 14 14 11 111 A B 111111 T A"Ill 014 <br /> 5 <br /> a� <br /> 1 1110 <br /> pew, "S dilli Engineering&Design(2022) $1,100,000 arl <br /> zou HRTsme Construction&Admin(2023-24)-$25,300,000 <br /> HRT Start-up and Commissioning underway Total Estimated Cost= $26,400,000 <br /> CSO-052 Flow and Pollutant Data Collection 2021&Prelim Engr 2022 <br /> Andrews Pre-Construction Flow and Pollutant Data Collection OPWC grant application:$2,400,000 under consideration <br /> On-going DOJ negotiations Investing in Ohio's Future grant application:$51M under consideration <br /> Nkf6�Y�a�r«rirr��yiii i -am rrmwaarru�✓. r�iu�l�r��q <br /> REFUSE RECYCLING,ANIMAL <br /> " al <br /> SHELTER&STOCKPILEYARD <br /> Other Public Works Engineering Projects <br /> y� Lakewood Hospital-Continue Site Improvements for Future Development <br /> Lakewood Park Pier—Concepts and Public Engagement <br /> §f <br /> Lewis Sewer and Roadway Improvements(Franklin North)—Design <br /> t I i <br /> � V <br /> 7 v Traffic Studies for CMAQ and Pedestrian Improvement Areas <br /> l" s Digester#3 upgrades—Design-Build <br /> VV <br /> r. <br /> i' <br /> Design 2021 fL , `;! W WTP Replace 3 Aeration Blowers <br /> Construction 2022-2025 <br /> Recycling 2022 Belle Sewer ROW Lateral Replacement—Design/Construct <br /> Demo Incinerator/Site Work 2023 tir <br /> Animal Shelter 2024 <br /> Construction:$7,000,000 <br />