Laserfiche WebLink
F <br /> W WTP <br /> y <br /> iGirr a �)Wrf 4�� iili o %�w 6 <br /> 2022 Accomplishments <br /> • Treated Approximately 7.3 Million Gallons per Day(2.65 <br /> trillion gallons per year) <br /> • Final Settling tank water blast epoxy paint metal framing <br /> • Combined Heat and Power(CHP)Generator from Digester <br /> reduced power usage by 25% <br /> f„ <br /> • Chemically Enhanced High Rate Treatment(CEHRT)treated <br /> 26.6 Million Gallons CSO over 27 rain events <br /> • Sludge Disposal <br /> -Quasar Recycling Facility—1,100 lbs to April <br /> -Farm fields—2,400 lbs to Sept <br /> • Three aeration tank blowers replacement design completed <br /> : <br /> � f <br /> f <br /> � zoza�aatg WWTP <br /> • <br /> Fine tune HRT <br /> • Aeration Tank Blower Replacements <br /> Bid/Construct-$2:3M <br /> • Digester#3 Design Build Contract <br /> $1.75M rr <br /> • Incorporation of more functions into i J't i" �g <br /> SCADA system-$50K <br /> • Replace aging pumps with <br /> A efficient pumps <br /> i <br /> •'Rag Compactor/UVbulbs/Sweep d�.,'�� • • i • <br /> � a <br /> arms-$320K <br /> I <br />