My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
minfin 12-19-22
Document-Host
>
City of Lakewood
>
Committee Minutes
>
2022
>
Finance
>
minfin 12-19-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 3:32:02 PM
Creation date
1/25/2023 3:31:06 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Finance
Date
12/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
West clikon—Shaft#12 Drah Plan NOTES <br /> 1)Noon street parking 1236 to 1264 Wes[Clifton <br /> 2)T P ryT ff'S'gnels to ma ntanone 20' <br /> wid ff <br /> Y'310 As t Oevicewll 6e placed mr <br /> � u� tz52(1256 AND for 1244(1248 west ahfton <br /> 411252/12564448 NatightT— ,d,, t rf, ✓ k, <br /> 4v1246 NORghCTnrnpnde"ed REFUSE RECYCLING <br /> 5)Refuse Collect on w II be word nated d / '� (�� <br /> p I: <br /> R2�Pitc d d c b sesadTe i <br /> STOCKPILE YARD MI b,. — Illllllliu0IIe <br /> City will nminewith tkwdsnal, <br /> wwFE""izp ISII IhI11A 11111111111 All'll�. 11\1I1 <br /> t t ptot AF <br /> Sh eAccess <br /> ja, tl� <br /> Or vewaV Ass st I-- <br /> Ir emp.Tape,3"pe N Phases 1 and 2-Construction 2022-2025 <br /> Mal Tasks Completed Initial Bid over$9M/Rebid Phases 1 and 2 only <br /> Cleaning,CCN,and Laser Scan all 19,000 feet New Recycling Center under construction and Refuse Truck Facility Renovations <br /> Soil Borings Demo Incinerator Structure/Site Work for Stockpile Yard 2023-24 <br /> Surveying <br /> Community Outreach Planning Construction:$7,650,000 Received County ARPA Grant$1,500,000 <br /> Maintenance of Traffic for 12 shaft locations <br /> Meeting with impacted businesses and residents at each shaft location Animal Shelter to be bid separately in 2024 <br /> Other Major Public Works Engineering Projects <br /> Former Lakewood Hospital—Completed Construction 2022 CONTACT INFORMATION: <br /> Capping PCE(No Volatiles in storm water/pumping not required) <br /> Site Improvements for Future Development <br /> West 1 17t'GCRTA Bridge plan development <br /> CUY-90-6.83 Reconstruction(1-90 Hilliard to 1-490)planning <br /> Major Emergency projects <br /> Ethel sewer collapse MARK PAPKE, PE, CPESC <br /> Sanitary Main Valley Parkway over Rocky River(construction January 2023) CITY ENGINEER/INTERIM PUBLIC WORKS <br /> 8°Watermain at Foster Pool DIRECTOR <br /> 2022—Fourteen private development plan reviews and inspections <br /> 2022-23—Dominion Gas Main Replacements and Meter Move out 216-529-6807 <br /> coordination/inspection <br /> mark.pal�keCc Iakewoodoh.net <br /> 2023 Goals <br /> Manage all PW projects-Design,bid&construction <br /> Continue private development oversight&Utility company projects <br /> Bury Overhead Wires along various corridors Study-$75K <br /> Bid/Construct-Belle Sewer ROW Lateral Replacement-$750K <br /> Prelim Engr Cliff Outfall-$50,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.