My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
mincow 10-28-19
Document-Host
>
City of Lakewood
>
Committee Minutes
>
2019
>
Committee of the Whole
>
mincow 10-28-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:34:42 PM
Creation date
12/19/2019 3:34:39 PM
Metadata
Fields
Template:
Office Of Council
Document Type
Committee of the Whole
Date
10/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE COMMITTEE OF THE WHOLE <br /> October 28, 2019 <br /> Auditorium <br /> Present: Councilmembers Anderson, Bullock, George, Litten, O'Leary, O'Malley & Rader <br /> Also Present: Mayor Summers, Urban Designer Allison Hennie, Human Services Director <br /> Gelsomino, Assistant Law Director Swallow, Deputy Clerk Lascu, Clerk Bach taking minutes, 2 <br /> members of the public <br /> Call to Order: 7:08 p.m. <br /> Motion by President O'Leary, seconded by Vice President Anderson to approve the minutes of <br /> the September 30'h Committee of the Whole. All members voted in favor. Motion passed. <br /> RESOLUTION 9097-19 - A RESOLUTION to take effect immediately provided it receives the <br /> vote of at least two thirds of the members of Council, or otherwise to take effect at the earliest <br /> period allowed by law, authorizing the Mayor(Director of Public Safety), the Director of Public <br /> Works, the Director of Law, the Director of Finance, and/or the Purchasing Manager to establish <br /> procedures for and engage in the process of letting of one or more contracts with one or more <br /> qualified entities for design and construction for the repurposing of Cove Church without the <br /> necessity of competitive bidding; and exempting the City from certain provisions within the Ohio <br /> Revised Code related to design-build contracting for the purposes of this project. <br /> President O'Leary summarized previous discussions regarding Cove Church. In May Council <br /> voted to purchase the property. At the most recent Committee of the Whole, the administration <br /> updated Council on the potential next steps and was still deciding between new construction and <br /> adaptive reuse. For adaptive reuse, it was deciding between a traditional design-bid-build or a <br /> design-build approach. Since that time, the administration decided to move forward and propose <br /> an adaptive reuse and design-build approach. A draft RFQ has been proposed and is before the <br /> Committee for consideration. <br /> Mayor Summers asked for Council to approve the release of the RFQ on Monday November 4h. <br /> He stated that releasing the RFQ is the beginning of a collaborative approach between the City <br /> and prospective developers. <br /> The administration displayed a slide with a proposed timeline, which they stated was flexible. <br /> • November & December 2019 - identify interested parties and receive submissions. <br /> • Use a selection panel to narrow down the submissions to a few finalists. <br /> • Ask finalists to submit an RFP with details and costs. <br /> • Late Jan. 2020 —selection of developer <br /> The administration compared aspects of the process to that of OneLakewood Place, noting that <br /> this one is more straightforward because the City will not give up ownership of Cove Church. <br /> Ms. Hennie remarked that there are three simultaneous conversations going on: <br /> • Internal conversations regarding the selection panel <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.