Laserfiche WebLink
M.V. ORDINANCE N0. 8.4= 25 <br />Page -2- <br />General Engineering Projects - Schedule I (cont'd.,Z <br />Foundations <br />Dams and Hydraulic Structures <br />Highway and City Streets <br />Street Reconstruction <br />Incinerators <br />Intercepting, Relief, Storm or Sanitary Sewers <br />Outside Electrical Installations <br />Power Plants <br />Pumping Stations <br />Railway and Bus Terminals <br />Electrical Transmission and Distribution Facilities <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal Improvements <br />Water, Sewage and Industrial Treatment Plants <br />Water Intakes and Sewage Outlets <br />Minimum Fees - Schedule I <br />Cost of Construction: <br />5100,000 - 12~ <br />5100,000 - 5500,000 Base <br /> 7.5~ <br />5500,000 - 51,000,000 Base <br /> Plus <br />51,000,000 - 55,000,000 Base <br /> Plus <br />Fee of 12~ of 5100, 000 Plus <br />of amount over 5100,000 <br />Fee of 8.4% of 5500,000 <br />6% of amount over 5500,000 <br />Fee of 7.2~ of 51,000,000 <br />5.80 of amount over 51,000,000 <br />General Engineering Projects - Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines <br />