My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981 017 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1981 Ordinance-Resolutions
>
1981 017 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:50:26 PM
Creation date
7/26/2018 5:46:52 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
017
Date
4/17/1981
Year
1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORDINANCE NO. 81-17 <br />Page -2- <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal Improvements <br />Water, Sewage and Industrual Treatment Plants <br />Water Intakes and Sewage Outlets <br />Minimum Fees - Schedule 1 <br />Cost of Construction: <br />$100,00 12% <br />$100,00 - $500,000 Base fee of 12% of $100,000 plus <br />7.5% of amount over $100,000 <br />$500,00 - $1,000,000 Base fee of 8.4% of $500,000 plus <br />60 of amount over $500,000 <br />General Engineering Projects - Schedule 2 <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Construction: <br />$100,000 9% <br />$100,000 Base fee of 90 of $100,000 plus <br />60 of amount over $100,000 <br />$500,000- $1,000,000 Base fee of 6.60 of $500,000 plus <br />50 of amount over $500,000 <br />(c) If, after the plans, profiles, specifications and <br />estimates of costs for work authorized and approved by the Council have <br />been prepared by the Engineer, the proceedings for such work is <br />abandoned. or is postponed for a period of more than six (6) months, or <br />the actual construction of such work is not commenced within nine (9) <br />months after the date of delivery of said plans, profiles, specifications <br />and estimates of cost, then he shall be paid forthwith a sum equal to <br />seventy-five percent (750) of the fee stated in Sec. 2(b), based on <br />the total estimated cost of said improvements, as full compensation <br />for all work done up to that date upon the subject project. In the <br />event the proceedings for such work so abandoned, or postponed, is <br />revived and actively pursued by the Village, he shall perform the <br />balance of the services to be rendered under this agreement and not <br />previously performed, and he shall credit against the total compensa- <br />tion due any payments made under Sec. 2(_c). <br />
The URL can be used to link to this page
Your browser does not support the video tag.