Laserfiche WebLink
M.V. ORDINANCE NO. 81-70 <br />Page -2- <br />General Engineering Projects - Schedule I (cont'd:) <br />Pumping Stations <br />Railway and Bus Terminals <br />Electrical Transmission and Distribution Facilities <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal Improvements <br />Water, Sewage and Industrial Treatment Plants <br />Water Intakes and Sewage Outlets <br />Minimum Fees - Schedule I <br />Cost of Constructiono <br />$100,000 - <br />$100,000 - $500,000 <br />$500,000 - $1,000,000 <br />$1,000,000 - $5,000,000 <br />120 <br />Base Fee of 12% of $100,000 <br />Plus 7.50 of amount over $100,000 <br />Base Fee of 8.4% of $500,000 <br />Plus 60 of amount over $500,000 <br />Base Fee of 7.20 of $1,000,000 <br />Plus 5.80 of amount over $1,000,000 <br />General Engineering Projects - Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and.Drai:nage Ditches <br />Landing Fields <br />Levees and Flood Wa11s <br />Off-Street Pax}cng Lots <br />Retaining [n1a11s <br />Sidewalks . <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and-Gas Transmission Pipelines <br />Minimum Fees - Schedule Z <br />Cost of Construction: <br />$100,000 <br />$100,000 - $500,000 <br />$500,000 - $1,000,000 <br />$1,000,000 - $5,000,000 <br />0 <br />9% <br />Base Fee of 9% of $100,000 <br />Plus 60 of amount over $100,000 <br />Base Fee of 6.60 of $500,000 <br />Plus 50 of amount over $500,000 <br />Base Fee of 6.0% of $1,000,000 <br />Plus 4.90 of amount over $1,000,000 <br />