Laserfiche WebLink
24 hours in moist air, 175 lbs. .. ,.. <br />7 days (one day in air, 6 in vrater), 500.1bs., <br />28 days (one in air, 27 in water), 600 lbs. <br />One part cement, three parts Standard sand. : .. <br />7 days, (one day in air) ; 200 lbs. <br />28 days (orie :e1ay in air, 27 in water), 275 lbs. . . <br />' (b) 'I'he sand used shall be that required by seotion-87 hereof. <br />( c) Aggregate. `i'he aggregate'- shall consist oi hard broken stone free <br />frotn dust, clean gravel',,slag or sirnilar materia.l:.crushed; and screened to pass a <br />one-inch ring and rejected on a 4 inch.ring. Both sand,,and aggregate shall be <br />subject to the approval of the Tnspector. or" Buildinos,.vaho, may-demand that any, <br />material in question be testecl- at the expense of tlie owner or owners in an, ap-. <br />proval test test"irg lab'oratory and the certified::results submitted to the Ins- <br />pector of Buildings to rzid in iorrn.ing an o:pinion as to the fitness or unfitness, <br />of the material for the purposein tended: . <br />Sec.144:. STEEL IN CONCREIE. All reinforcing steel not,rolled from bil- <br />let shall be rolleet from-standard section- tee -rails and snall comply with the <br />physical properties of concrete reinforcing bars.adopted by The gssociation of <br />American Steel` Manufa:cturers; 19104 A complete physical test shall _ be niade by <br />an approved testin, laboratory of each si.ze of bar to,be applied by the; manufac- <br />turer on the contract frorn each ten (10) ton lot or less aahenever the Inspecter <br />of Buildings ma.y demand sixch •test.s; . and: certifiesi copies of al1 test reeords are <br />tn be submitted to him- for exainination ulnon iiis requesta <br />Hot twisted bars of hioh carbon,..steel shall be turisted ,with ors complete <br />twist in a length equal to not more than twelve (12,) times thd:thiclzness of the <br />bar, , . . . <br />- The Inspector of Buildings may demand the owners, Uuilcler, .coztraetor, <br />sub-contractor, or foreman to make, or cause, to _be ,made, ben.ding. te:st.s in the <br />field, on all grades of rein£orcirxg steel, then tntheir opinion there is any <br />doubt-as`to ,?hdther tlze reinforcing steel is-up to the standard of -Ghese regula- <br />tions. - . . ;. . <br />`hese bending-tests shall be thase specified,in the above mentioned t'stan- <br />-dard Specifications." <br />Sec.145. PLACING CONCRETE AND STEEL. In filling in coilcrete around re- <br />inforaing steel, the concrete must be worked continuousl.y with suitable tools as <br />it isput in place. Filling the columns comple,tely and puddling afternvards will <br />--not be pernit-ted. -In placing'-the concrete the.w,orl.•_shall, be so laid out that par- <br />t;i`ally set' concrete will not=be subjected ta;:shocks -fro.n the wheelin.g or handling <br />? „_ <br />`?laterial over it.'- Concr'ete placed in ?rarm .v?eather shall be drenched withvuater <br />twice ciaily, Sun.day includec7_, during, the. first we.ek after being put in place. <br />iidhen it is not possible- to cast an entire structure in one operatio4 the <br />" work should be stonped; ^for ' colurnns at..the: underside _..of girders for girdere at a <br />point mi.dway,between supports, unless'a beam sllould occur at this point;.in a?liich <br />case the joint should be offset a distance eaual to,ttvice the width of the beam; <br />forslabs at the center of the span.., . , . , <br />When work is resumed the eoncrete previously placed shall be cleared of <br />'all foreign material, dxenched .and slushed with mortar composed; of one l l) part <br />cement and one (1) part sand. . , <br />Beams and girders sha11 not be constructed over freshl:y placed columns