My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1932 135 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1921-1945 Ordinances
>
1932 135 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:51:32 PM
Creation date
8/6/2018 7:22:05 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
135
Date
1/18/1932
Year
1932
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QRDINANCE Ita: 135. <br />INTRODTJCM) BY IZRm PARIOR <br />AN QRDZNANCE PROVTDSNG FOR LHGI =14RIiuG M-RVTCES. <br />, <br />. <br />`'VM- R'AS¢ this C°ouncil is of the opinion tYiat pro-- <br />uision should .be made. for- engineering services in order? to in- <br />sure the- pr-operdesign and supervision of' construction af muni- <br />cipal street improvementss TIMR EEFORL, BI-ji IT ORDAIl'D by t.he Counci 1 of the <br />V illage of Mayf ield;.,,S'tate of O:hio: that <br />Seet,ion 1. The' Sterling Engineering Company, a <br />co,rporat.ion organized and . existing under the 7:aws of' Ohio, be <br />and is hereby"aPpoi:nted and employed to reader e:ngineering ser- <br />vicQs for the Village of Y-ayfield. ` t S?cti on 2. Sa id.' Eng ineeg sizall ba.ve c liar.-ge of the <br />making and preservation of all__surveys, ma:psa plans, estiinatea, <br />des%gns, specificat.ions and supe:rvision of• construct.ion for- a1T <br />muriic.ipa:l street improvements, and s.ha7.l perforn sueh othex duties <br />as may be clireeteel and a.ut.horiz,ed by the Councila <br />Section 3.. The ViT3age aof M?yfield in eonsicleration <br />of the fa.ithf;ul performance by The Sterling -Engineer?ing Company <br />of the severa.l things, by it to be. perf6rmed agrees to pay said. <br />3ngineer a sum equiva]:ent. t.o four- per eent W-1) of the contraet <br />cost, of all municipal street improvements whic.h ma_y be. atxthorized <br />for said 'nriunidi.Pa.lity. Ihat the cornpensation herein Provided . <br />for sha.1T be payable a.s follows: <br />- Tw.o pe r eent tWo) of the e ontrac t. c os t of s ti•eet , <br />improvemenus $o be paid when drawings ancT s?pec-ifi- <br />eat.ions for the wor.k hage been approved by-the <br />iuiunicipaaity and the. notea and bonds, solel. <br />. lvo per cent. (2%) of the contract cost of street. <br />. impr.ovements. to be paid an each estimate. issued to <br />the Contractor, -except: the final estimat.e, for which <br />the amount. shall be adj us ted so tha t t he to tal amount <br />F.?;. !. . paid tot:he Engineer shall equal four- per cent (4%) <br />of the contra.e.t, cos t. .. .. <br />SectiQn 4. . The compen.sation t.o said Engineer- for <br />ariak.ing specia.l. a.nd prelimina,ry surveye, reports a.nd investigations, <br />or• ather services, for whic:h payment is not. mde on a percent'age <br />basis, shall be upo:n a: basis not. to exceed the folToiving rates: <br />Survey Party $240'00 pes dayr <br />Chie f o f Survey Pa rty. . 1.25. pe r ho`ur <br />Ins t.rumeai tmail. . 16-OQ n- dr. <br />8odman or Ghainman 0.15: ?r' nl
The URL can be used to link to this page
Your browser does not support the video tag.