Laserfiche WebLink
<br />GUARP,NTEE <br />(a) GU~.RriTdTEE: The Contractor shal~_, at his ovm expense ar_d cost, make any re- <br />pairs to the pave~,~ent made r_ecessary by ordinary traffic, action of v~~eather o.r <br />defective vrork in construction, for the three-year period of guara:itee from. and <br />after the acceptance for fin al estimate of the cor•~p~_eted v~*Orlt by the Engine er <br />and Council The Contractor shall, dur~.ng the period of guarar~~ee or at the end <br />thereof, resurface any portion of the work or rcr_evr any portion: of the base con- <br />structed under tn.is contract, if, in the judg~:ent of the Er...gineer and Council, <br />the condi tion of the pavement 's such that rc:~~.iring or resurfacing is necessary <br />to effect repairs, provision for v;~hich is made under this guarantee. <br />(b) GUAkhA:TEE FUP1D: n consideration. of the prices to be paid for the v~rorlc herein <br />specified, the Contractor hereby guarantees that the workmanship and materials <br />provided under these specifications are in eTre:c^y respect first-class and, that for <br />a period of t:!~ree years, fron•~ and after acceptance of said work, the pavement shall <br />require no repairs, the necessity for which shall be occasioned byT defects in <br />vorkmanship or material. If, 'rAovrever, during sai d period of paving guarantee, the <br />pavement shall require repairs or renewals, vrzi cr, repairs m~.y be occas~.oned by <br />settlement of foundation, defective workmanship or materials used in construction <br />then such r;pai rs vJill be begun by Contractor vrithin ten days after notice from <br />t're Engineer. <br />There v~~ill be retained by said munici pality, from the amount due upon the <br />final estimate, a sum. of money, as a deferred payment, equal in amount to fifteen <br />cents per square yard for all pavement, v,~hich amount grill. be retained by the <br />municipality as a guarantee upon part of the Contractor that the v~orkmansl~ip and <br />materials furnished under the specifications are in all respects first-class, <br />as herein provided and the pa~d.ng v~rill remain in good and sound condition, for and <br />during the period of paving g•~3arantee after completion of and acceptance of vrork <br />by Engineer and Council . <br />Should the Contractor ma'~e all necessary repairs, as directed, at expiration <br />of guarantee, then said amount, less any expense that the municipality may have <br />incurred, stall be returned to :said Contractor as full payment for any balance <br />due on said contract and improvement as herein provided. SlZOUld snow, ice or <br />mud prevent Contractor from making repairs at expiration of the time specified <br />then this guarantee shall remain in fall foxce and effect until such time as it <br />becomes possible to make inspection and repair. <br />