My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1957 566 Ordinance
>
Mayfield Village
>
Ordinances Resolutions
>
1954-1957 Ordinances
>
1957 566 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:52:00 PM
Creation date
8/6/2018 9:49:13 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
566
Date
3/18/1957
Year
1957
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.. <br />r <br />1 <br />shall be discarded. Under no circumstances shall concrete be used that has p_~.:•`•- <br />ially set and the re-mixing of such materials is 1~rohibited, The concrete sha]_1 <br />be deposited b~tT^reen bul'sheacls of a uniform thi ckness and to the full depth arlcl <br />v~rid•th of the wralk, irregular or sloping surfaces shall be avoided. The concrete <br />after. being placed shall 'oe th.orough7.y compacted and brought to tl-ie proper pitch <br />and grade writh a templet or straight edge.. <br />Immediately prior to the finishing of the surface, the ti^sal',: sha].1 be cut <br />into slabs not longer than six feet on any one side. The joints sha11 be cut <br />through the full thickness of the rr~~1k and the opening so made shall be fi 1].~d <br />i~^ith clean, dry sand w,~ell rammed into p7.«ce, The joints sl~a.11 be formed ioJr a <br />cutting tool or other means sa-tisfa.etort,~ to the Engineer. The. markings ilz t:ie <br />surface of the wJalk a,t .these joints sr~11 not be more than one-fourth inch deep. <br />till edges shall be rounded z~n tii an approved edging tool 'to a radius of one- <br />f ourtl~ i rich. <br />7. SU?F!CE FIi~}TSH: The finishing of the ~„•~ ~k shall i±?~snediately follow: the placing <br />and compacting. of the concrete. Unless other~~;],se orcler~oci by the Engineer, a <br />finish produced by rubbing rith 5rrood floats -!rri11. be required. The surface shall <br />be free from depressions or ineq_u~tilities, The ap;oiicatioiz of dry' ce?nent to <br />• hasten drying of ~t_~ie surface is prchibited, <br />8$ CIJi_i'.ING !!}>~ PFtOT~~CTIITG: In rainy wreather, the concrete shall be protected a.s soon <br />as it is finished, In hot or dry wreathes, the Contractor shall '_.~eep the concrete <br />wret. Sprinkli ~-~g shall be begun as soon as t-.Ze concrete is set sufficiently to <br />prevent pitting;, and shall be continued "at such intervals as the wreathes concli~ <br />tions may. require, br. the Engineer may direct. <br />9. EXl'!!NSiON JOIPITS: Prepared strips of bitumen and fiber or mineral aggregate, <br />shall be placed in concrete ti~ralYs at intervals of at least twaenty feet, also <:t• <br />ends wrhere the w••rallk abuts cz:.rbing or other laLteral wra].lcs, anal along the buildir~.~; <br />line ~~rhere the ~~ralk is laid fu11 wri d.th frrom., the curb to the building or other <br />structures. Simi1<~_r joi_its sha7..l be placed around ;~•rater--?;2eter covers, gas boxec,s <br />hydrants, lamp standards rr other fired objects pro~ieeting through the vralk. 1~."~_l <br />strips sha11 be one-fourth inch in i;hiclcr?ess, except for transverse joints z~'nen' <br />the temper attire is 'oelowr 70° Fal~rerizeit, in ~~rhi_ch event the strips shall be one-"~ <br />half inch itz~ thicl~r~ess . ~i'he top of the strip shall be cut off flu,,^h i':rltl'1 the ,top <br />of the concrete. <br />10. ":i0R1~ IA1 FRETJZIi~}G l~~-Ea:Tl~~~i.~t: Unless otherwrise specifa.ed, co:~zcrete ~^rhen depOSltUc'• <br />shall have a temloer2ture oz not less tl~an >0 degr;:es Fa:nrenheit, nor more than <br />ll~~ degrees Fahrenheit. Zn freezing w.rea.ther, suitable means shall be provided <br />far maintaining the. concrete at a temperature of ~.7 degees Fahrenheit for a <br />period of not less t,zan seven (7) da~rs. <br />Constr,zct~.on must stox~ if the temperature falls, to ~6 degrees Fahrenheit. <br />Vo fr. oxen mate.ri~=rls sha11 be used in the ooncrete nor sha.11 concrete be laid on <br />.frozen ground. .F~ny concrete wrhl.ch may be c7.a-nas~d by frost action shall be re- <br />placed bzl the Contractor at, his o:4rn ~enl~ense. . <br />11, COi'dCR~~'E TEST SPT~CT~ ~.E:~~S: 'iwro test cylinders, , 5 inches in diameter and 12 inches <br />high shall be made each day fro?~~ concrete z~rhich is being incorporated in the uJorlc. <br />if so ordered by the Engineer. These cylinders sl~a.ll. be made and tested by a <br />reputable ls_bora.ory selected by -the Engineer, shall be made in accordance vrith <br />Standard i!yethod of ifalcing ca.nd Staring Compression Test Specimens of Concrete in <br />the Field, ~l..S.T.?~. 17esi~,n~.tion C 31, and then tested in accordance writh Standard <br />I.~lethod of. Test for Compressivo Strength .o:e Molded Concrete CTlinders, A.S.T.PI. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.