My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1963 825 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1961-1964 Ordinances
>
1963 825 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:52:57 PM
Creation date
8/7/2018 6:20:10 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
825
Date
12/16/1963
Year
1963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
barricades and red li~,hts at. night during this period. <br />?;then the average temperature is belo?nr 50 degrees Fahrenheit, sprinl~_lin <br />ma.y be discontinued except ?~•rhen the surface shovrs signs of drTino~' too rapid~_~r. <br />Tf at any time the temperature is apt to drop belo~nr 36 degrees Fahrenhe.-it, ,~.nTT <br />completed. pavement, lain less than ten (10) hours, shall be protected by nl^cir~; <br />a. covering of canvas, stray, or other suita'le material over the nearly laid con- <br />crete in such a. manner as to leave an air space between the surface or concrete <br />and protective cover. Disturbance of the enclosed a.ir shall be prevented as <br />much as possible by ?.•Teighin; the ca.riv^~s or other covering vrith timbers, sand o1:• <br />earth. <br />(q) TR~i~1SFAR..FI~iT I~ II~~: i iET11CL` OF OUR.r~1G: .zfter the concrete 1?as 'Deep properly <br />placed and finished as specified, and ?•~hen so ~_;erm:itted b.y- the Enoin~oer or <br />spec:~fied, concrete ~;avements ma.;~r be cured by tl-~e use of a. colorless transparent <br />film meeting 1;he requirer.~ents of said ~7trte I-~i~hr;ay Specifica:tioi~s, Section <br />I..-10.2L~~ The preli:~inary curing by t'_;e use of ~~-et burlap or canvas mar be <br />omitted ?^.rhen this t~~-pe of curin4 is fo~lo~~;ec.c <br />The curing material shall be a.~~nlied uniformly by -n~~r~ns oi` an approved <br />pressure spray distributor at the rate of one (l) La.llon to each 200 square feet <br />of surface, and it shall be so applied that the concrete surface is completely <br />coated a.nd sealed a.t one application and is not n?ar~'ed. The curing m~3terial <br />shall be .apl,lied im:rediately a.f~ter the concrete sur"ace to be cured 17^s been <br />finished and before any marked hydration has occurc~d. After the surface l.as been <br />CoatP,d., it shall be protected from a.ll traffic or a'ora.sive action from any source, <br />Comnl.ete: duplicate spraying outfits shall be on the site of the work v1~l~ere <br />~' ~' ~ ° ~ '1 ~ ~' ^tln~ 1a St.^1'teC! . <br />this met.ioo. of curing is ~_aopted be_ore concr•c ' <br />Before the curing cor,~_pound is spra~red unen the pavarie;.lt, the Contractor <br />must cover a.11. joints ~°,d.th a strip of burlap z:ot less than 12 inches ~~ride and <br />shall then c?u e the concrete in and adjacent to the joint bl the me~thoct of crater <br />curing as specified in paragra_~h (p) Curint: abo~re. The -rest of the pavement may <br />then be cured by the t-ranspa:rent l i lm matlaod. <br />Contractor shall erect suitable bocci cacies anc'. take adeau.te precautions to <br />keep all traffic or paving; operations ai'f ~Lhe concrete anti 1 the expir•ati on of <br />seven (7) days from t:~e time o£ ~:.~=plication_ of t?'±e c~_trin~, cor?~oLU~d. <br />(r) DFI'Tll: The concrete pavement shall have a. thickness or depth of a.t least the <br />thickness sho?;m on the plans or proposal, ?zritl~ :;_ts top st::r•f..ce, a.s specified, to <br />finished grade. <br />(s) COST: The contract ,rice per squarevarca. for rein~'orce~u concrete pavement <br />must cover all cast for materials, l~~bor, ?~•;a+..er, supervision, machinery a.nd equip- <br />ment, steel mesh reinforcc.mei~.t and joints for the com~oletion of concrete p~wemen~t <br />i_n conformity vaith the requirements of this specification and its maintenance and <br />repair until its acceptance and during; the period of guarantee. <br />(t) P~':`i1~~ETdT F'0~. COl`,~C?i?.TL P~1~lLl~.J!•?T: The _r;rice paid per sgv.a.re yard of concrete <br />pavement sha11 be the contract price for this :i.tem provided it meets the specified <br />thickness sho?-rn on tine glans or proposal. In the event tlZe concrete pavement, <br />constructed ~~s herein specified, is found to be deficient in thickness, the price <br />paid for such ?~~rork sY?~~11 be tlZe prig bicl for the same but modified as sl~io?°:n in <br />the follo~nring schedule <br />- FRIC~S 'TC :3E PfiI':~ FOR ~rlR_CUtJS ~::~i~~Li.:,'.G.~:; TNIi;'iiNisSSES - <br />?rleiGhted _~vera.ge `I;.-:ic':rness Pro~.o_rtion of Frice per <br />Square ~rard in Contract <br />CP-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.