Laserfiche WebLink
<br />( ~•) PrlYi:il!,'•iTS : In mahirzg payments under this contract, quantities <br />vril.l be estimated from the actual. measur~nents of the Engineer. It is <br />agreed and. urcierstnod that the quantities shovrn on the bid blank are <br />approximate only and a.re used primarily to compare unit prices submitted <br />by all bidders and that such quantities as shov~rn on bid blank may be <br />increased or decreased as the principal under th~.s contract may elect. <br />1.0 labor or i~~a-te-rial furnished outside of the provisions of this abrce- <br />ment shall be paid for unless i.;Yie wire has been dor_e upon v~nitten order <br />of the Engineer. <br />On or be*'ore the first ~;:~eeli of each month the Contractor shall <br />furnish, the engineer ~-rith a statement of the- ap;~royimate estimate of <br />the 1:rork ti`rhi ch has bec~r~ done in conformity ~~~rith these specifications. <br />tih~n the ~sng:i_neer leas ciiecl~ed this estimate and. determined the total <br />amount of t~~Tork per'formed~ this, ~r?ount, less ten percent (10;x) shall be <br />due the Contractor' after dedt~ctirig all preva_ous estimates,. Payment <br />for partly conrpl_ete~. ?~orlc, and for mater=a.l delivered. to the site and <br />not installed in the ~;aork, grill. be paid :nor a:t a p-rics ;~r.~ich, ~.n the <br />juc~ge~ueht of the Engi neer, r:_:pres er_ts the cost to tyre Contractor for ' <br />such ~;io rk. <br />Ten clays after the fina7_ measurements have been mace and after <br />acceptant:; by the _sn~•ineer an di the City of Cleveland., Division of "~;ater <br />and Aaat, the Ln€;ineer shall suiara'Lt the final estiiaa~te in f~al7_ f^r. al.l <br />vrork performed; from rriiich estimate, hOti'reVSr, tl~ez e sha7.1. be deducted <br />5;~ of the entire amount ~-rlis.ch shall be retained. for a. period. of 1a. months. <br />ilt the expiration of the 4 month period, the Contractor shall refil]_ any <br />depressions or remove any surplus from the =l;r~~et and. clean and repair <br />an~T cart of tl~e work antler this contract. Ur on the completion of such <br />work to 'the satisfaction of the ~~~n~~ineer, 3~ of the tota7_ contract amount <br />sha11 be raid to tYte Contractor . The reraai ni ng tv~ro percent (2;~) due the <br />Contractor sha7.1 b e reta-i_r_ed_ for an additional period of t~nrenty (20) <br />months, as a guarantee upon thy, part of the Contractor that the ti^rork <br />?rill :remain in Locc't sound. condition. <br />If any of the v~rorl{ done under this contract shall, in the opinion <br />of the ":ngineer, require repairs, replacements, or baclciil7_ings, the <br />Contractor agre^s t,o furnish all T:~aterials a:nd do all such v~;orl~ at his <br />ovtrn expense. 51'lOLll.d the Contractor fail to do so ~~~rithin a reasonable <br />time after notifination, the 1?zgineer sha11 have such t~~ror'.~c done a.nd the <br />cost of same paid out of the above tv~ro percent (?_;,) guarantee fund. <br />Should the cost e~_ceed this sum the Contractor a€;rees to .pay the amount <br />of the excess . <br />(h) 4J~!.':TE _i,1:T?S`l'13T:`~T CO; t~!;;S1:T10i: The Contractor shall at all <br />times during the term of till s agreement subscribe to aild comply with <br />the tirorltrnen~s co~~?nen~ation 1a~,rs of the State of Ol^:io and nay such <br />premiums as Islay be reaulred thereunder and to save the princi pal under <br />this contract 1_rarrn7_c:ss .from anti and all 7.iability arising from or under <br />said act. lie shall also fu.rni:=h at the time of delivery of this con- <br />tract anci.at such other tines as may be .requ.estecl, a cop;, of the official <br />certificate or rece:tpt shot-ring thc: payments hereinbefoi~e referred to. <br />-16- <br />