Laserfiche WebLink
.~ <br />(g) ;r01].K ~' FP~1;~2INCT 1'TEAT~ii~'-Z: Unless otherr,ise specified, concrete vrhen de- <br />posited shall 'nave a temperature of not less than 50° Fahrenheit, nor more t'rian <br />11~° Fahrei~~eit. In freezing ?^reather,= suitable means shall be provided for <br />maintaining the concrete at a temperature of ~5° Fahrenheit for a period of not <br />less than seven (7) days. T:ethods of heating shall be subject 'to the approva l <br />of the Engineer. <br />Cons~t.ru.ctiori must stop if the te~npera.ture falls to 36° Fahrenheit. Ido <br />frozen materials shall be used in the concrete nor shall concrete be land on <br />fr. ozen ground. Any concrete tis1-ii.ch riay be damaged by frost action shall be i°e- <br />pla.ced by the Contra.c-tor at his o~rm expense. <br />(h) PPO'I'GCTTON AI•ID CiTtJ..ING: After the forms have been removed the concrete ;must <br />be cured by covering ?-rith ?~~~et burlap or cctton mats ~tJhich shall be 1{ept in a. <br />thorou~;hJ.y moistened condition for at least 21a. hours. As soon as the y4Tet bur- <br />lap has been reYnoved the curb shal]. be covered. ?.:ritl7 tou~l1, durable, one hundred <br />percent sulphate Ki°aft paiew" cemented v~rith a suit:able bi-ttuninous i!iaterial after <br />the e:s~~~osed curb has been thoroughly drenched ?~ri-t%z ;rater . This paper shall be <br />left .i_n pla.ce,, prope:rlur aiichorecl tiri -th stones cr es.rth 'to prevent disturbance by <br />?rind, for a period of six (h) days. <br />(i) T1~9.idSPARn,1 FJ~st;i T.IETIiOD OF CURIITG: After 'the concrete ha.s been properly <br />placed anti finished as specified, and ?~,~hen so permitted by the Engineer or speci= <br />fled, cast-in-place concrete curb may be cured by the use of a colorless trans-- <br />parer~t film meetin; the requirements of said State I.iighT~~Tay Specifications, Sec- <br />tion r7-10.2.. The preliminary curing by the use of ?yet b?n:°lap or canvas may be <br />omitted ?~rhen tl;is t~-p e of curing is foJ_lorred. <br />The cur. ing irate-~~.a1 si.all be applied uniformly by means of ar? approved <br />pressure spray distributor at the rate of one (1) ~alloiz to each 5~ lineal .feet <br />~... <br />of curb, a.nd it shalJ_ be so applied that the concrete surface is completely <br />coated and sealed at one application and is n~L• m~:~x~red. T;ie curing; material <br />shall be applied immediately after the curb forms have 'Deer stripped. After the <br />surface has been coated, it shall be protected from all traffic or abrasive <br />action from any source, <br />Complete duplicate sprs~.~ring outfits shall be on the site of the ?rJOrl~ ?~~there <br />this method. of. curing is adopted before concreting is started. <br />Contractor shall erect suitable barricades and. tale adequate precautions to <br />keep all traffic or paving open:tions off the concrete curb until the expiration <br />of seven (7) days from the time of application of -the cttrin~ compound. <br />(j) E]~PAiVST01`1 JOTi`dTS: At intervals of thirty feet a 3/~'t ex-pansion joint filled <br />?;ritll premolded bituminous e~;pansion material shall be constructed. <br />(k) 1~~~i.DIUS CU'r'~B: Straight curb forms shall be used on all stra.iht runs and set <br />to curve on all .radii over sixt-~; feet (~O'). Curb forms of standard radii shall <br />be used on all locations ?°rhich call for less than a sixt~T foot (60~) radius. <br />(1) COST: The contract trice per linear foot of curb, ?whether straight or radial, <br />vast include all costs for. material, labor, forms, equipment, machinery, grater, <br />cxca.vation, rairaning, ~'~.nishin~;, curing and disposal of all surplus during con- <br />struction and for the period of pavinG gus.rantee. Cur•$ must be true to lino and <br />i;rade of street before final acceptance. <br />.. ~:. SPLC IAL PE~UTiLii;!s: EN1 S <br />(a) EY1~~I1,iAT10Id OF PLILl~dS Ai'~iD SJ:TE: The Contractor slxa.ll carefully examine the <br />plans and slaecificatioizs, and shall male his o?ern esti,1na~te of the quantities of <br />C-1~ <br />