Laserfiche WebLink
0 <br />(k) Permit Fee for Each Sign or Billboard X5'.00, plus $3.00 <br />for each 60 square feet, in area or portion thereof <br />where permitted. <br />(1) Certif icate of Occupancy Fees. <br />(1) Fee for a Certif icate of Occupancy issued upon <br />final inspection of a new building, - single 5.00 <br />family duelling, two-f amily dwelling, or <br />commercial building. <br />(2) Fee for final inspection upon completion of <br />enlargement of or alteration to existing building. 3.00 <br />(3) Fee for Certificate of Occupancy ssued~~upon <br />completion of apartment building - each suite 2.50 <br />but not to exceed $100.00 per building. Subsequent <br />annual inspection,.each suite $1.50 but not to exceed <br />X50.00 per building. <br />(m) Certificate of Approval. <br />There shall be no additional fee for certif icates of approval <br />of plumbing, gas piping, or electrical work perf ormed under <br />permit for such work. <br />(n) Zicense Fees. <br />The annual fee for a plumber`s license or sewer builder*s <br />license or such other building trades or occupations as <br />may be placed under requirement of registration,licensing, <br />or certification by the regulations of the Board of <br />Building Code Appeals shall be 2.00 <br />Said licenses or certificates may be issued without <br />examination to applicants licensed or certified in the <br />same trade or occupation by the City of Cleveland. <br />(o) Fee for Setting Grade. <br />Whenever the Building Inspector is in doubt concerning <br />the setting of the grade for any construction, he shall <br />have the right to require the owner or appropriate permit <br />holder to deposit the sum of $25.00 with the Clerk, which <br />sum shall go into the general,f and of the Village, and in <br />such case to call upon the Village Engineer to set the <br />grade, and the Village Engineer shall be paid the sum of <br />$25.00 from the general fund of the Village for such service <br />in each instance. <br />