Laserfiche WebLink
M.V. RESOLUTION N0. 86- 13 <br />Page -2- General Engineerina Prolects - Schedule I(cont'd ) <br /> <br />Street Reconstruction <br />Incinerators <br />Intercepting, Relief, Storm or Sanitary Sewers <br />Outside Electrical Installations <br />Power Plants <br />Pumping Stations <br />Railway and Bus Terminals <br />Electrical Transmission anc7 Distribution Facilities <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal ImProvements <br />Water, Sewage and Industrial Treatment Plants <br />Water Intakes and Sewage Outlets <br />Minimum Fees - Schedule I <br />Cost of Construction: <br />$100,000 - 12% <br />$100,000 - $500,000 Base <br /> 7.5% <br />$500,000 - $1,000,000 Base <br /> Plus <br />$1,000,000 - $5,000,000 Base <br /> Plus <br />Fee of 12% of $100, 000 Plus <br />of amount over $100,000 <br />Fee of 8.4% of $500,000 <br />6% of amount over $500,000 <br />Fee of 7.2% of $1,000,000 <br />5.8% of amount over $1,000,000 <br />c'Pneral Enqineering, Projects - Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation anci Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines