Laserfiche WebLink
M.V. RESOLUTION N0. 85- 38 <br />Page -2- <br />General Enyineerina Proiects - Schedule I (cont'd.) <br />Railway and Bus Terminals <br />Electrical Transmission and Distribution Facilities <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal Improvements <br />Water, Sewage and Industrial Treatment Plants <br />Water Intakes and Sewage Outlets <br />~t~n~mum Fees - Schedule I <br />Cost of Construction: <br />$100,000 - <br />$100,000 - 5500,000 <br />5500,000 - 51,000,000 <br />$1,000,000 - 55,000,000 <br />120 <br />Base Fee of 12~ of 5100,000 Plus <br />7.5$ of amount over 5100,000 <br />Base Fee of 8.4~ of 5500,000 <br />Plus 6~ of amount over 5500,000 <br />Base Fee of 7.2~ of 51,000,000 <br />Plus 5.8~ of amount over 51,000,000 <br />General Eggineerinq Proiects - Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Construction: <br />5100,000 - <br />5100,000 - 5500,000 <br />5500,000 - 51,000,000 <br />51,000,000 - 55,000,000 <br />9~ <br />Base Fee of 9$ of 5100,000 Plus <br />6~ of amount over 5100,000 <br />Base Fee of 6.6~ of 5500,000 <br />Plus 5~ of amount over 5500,000 <br />Base Fee of 6.Oo of 51,000,000 <br />Plus 4.9% of amount over 51,000,000 <br />