Laserfiche WebLink
M.V. RESOLUTION N0. 85-51 <br />Page -2- <br />General Engineering Projects - Schedule I (cont'd.) <br />Railway and Bus Terminals <br />Electrical Transmission and Distribution Facilities <br />Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal Improvements <br />Water, Sewage and Industrial Treatment Plants <br />Water Intakes and Sewage Outlets <br />Minimum Fees - Schedule _I <br />Cost of Constructions <br />$100,000 - 12~ <br />5100,000 - 5500,000 Base <br /> 7.5~ <br />5500,000 - 51,000,000 Base <br /> Plus <br />51,000,000 - 55,000,000 Base <br /> Plus <br />Fee of 120 of 5100,000 Plus <br />of amount over 5100,000 <br />Fee of 8.4~ of 5500,000 <br />6~ of amount over 5500,000 <br />Fee of 7.2$ of 51,000,000 <br />5.8~ of amount over 51,000,000 <br />General Engineering Projects - Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Water, Coal, Oil and Gas Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Constructions <br />5100,000 - <br />5100,000 - 5500,000 <br />5500,000 - 51,000,000 <br />51,000,000 - 55,000,000 <br />9% <br />Base Fee of 9~ of 5100,000 Plus <br />6% of amount over 5100,000 <br />Base Fee of 6.6~ of 5500,000 <br />Plus 5~ of amount over 5500,000 <br />Base Fee of 6.Oo of 51,000,000 <br />Plus 4.9~ of amount over 51,000,000 <br />