Laserfiche WebLink
-2- <br />Tunnels and Caissons <br />Ground and Underground Sdater Storage Facilities <br />Waterfront and Terminal Improvements <br />Water, Sewage and Industrial Treatment Plants <br />Water Intakes and Sewage OUtlets <br />Minimum Fees - Schedule 1 <br />Cost of Construction: <br />$100,000 12.0% <br />$100,000-$500,000 Base fee of 12% of $100,000 plus 7.5% <br />of amount over $100,000 <br />$500,000-$1,000,000 Base fee of 8.4% of $500,000 plus 6% of <br />amount over $500,000 <br />General Engineering Projects - Schedule 2 <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls <br />0£f-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks <br />Sdater, Coal, Oil and Gas Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Construction: <br />$100,000 9% <br />$100,000-$500,000 Base fee of 9% of $100,000 plus 6% of <br />amount over $100,000 <br />$500,000-$1,000,000 Base fee of 6.6% of $500,000 plus 5% of <br />amount over $500,000 <br />(c) If, after the plans, proPiles, specifications and estimates of costs for <br />work authorized and approved by the Council have been prepared by the Engineer, the <br />proceedings for such work is abandoned, or is postponed for a period of more than six <br />(6) months, or the actual construction of such work is not commenced within nine (9) <br />months after the date of delivery of said plans, profiles, specifications and estimates <br />of cost, then he shall be paid forthwith a sum equal to seventy-five percent (75%) of <br />the fee stated in Sec. 2(b), based on the total astimated cost of said improvements, as <br />full compensation for all work done up to that date upon the subject project. In the <br />event the proceedings for such work so abandoned, or postponed,is revived and actively <br />pursued by the Village, he shall perform the balance of the services to be rendered under <br />this agreement and not previously performed, and he shall credit against the total <br />compensation due any payments made under Sec. 2(c). <br />(d) The fee provided in Sec. 2(b) hereof, shall cover engineering services <br />including preliminary estimates and reports, complete detailed plans and specifications,