Laserfiche WebLink
ORDINANCE NO. 73-12 <br />Minimum Fees - Schedule 1 <br />Cost of Construction: <br />$ 100,000 <br />$100,000 - 500,000 <br />500,000 - 1,000,000 <br />12.08 <br />Base fee of <br />Plus 7.58 <br />$100,000 <br />Base fee of <br />Plus 6ro 'of <br />$500,000 <br />Page 2. <br />128 of $100,000 <br />of amount over <br />8.48 of $500,000 <br />amount over <br />General Engineering Projects - Schedule 2 <br />Minor Roads and Streets in Sidewalks <br />Undeveloped Areas Street Lighting Systems <br />Irrigation and Drainage Ditches Water Distribution Systems and <br />Landing Fields Elevated Storage Tanks <br />Levees and Flood Walls Water, Coal, Oil and Gas <br />Off-Street Parking Lots Transmission Pipelines <br />Retaining Walls <br />Minimum Fees - Schedule 2 <br />Cost of Construction: <br />$ 100,000 98 <br />$100,000 - 500,000 Base fee of 98 of $100,000 <br />Plus 68 of amount over $100,000 <br />500,000 - 1,000,000 Base fee of 6.68 of $500,000 <br />Plus 58 of amount over $500,000 <br />(c) If, after the plans, profiles, specifications and <br />estimates of costs for work authorized and approved by the Council have <br />been prepared by the Engineer, the proceedings for such work is aban- <br />doned, or is postponed for a period of more than six (6) months, or the <br />actual construction of such work is not commenced within nine (9) months <br />after the date of delivery of said plans, profiles, specifications and <br />estimates of cost, then he shall be paid forthwith a sum equal to <br />seventy-five percent (758) of the fee stated in Sec. 2(b), based on the <br />total estimated cost of said improvements, as full compensation for all <br />work done up to that date upon the subject project. In the event the <br />proceedings for such work so abandoned, or postponed, is revived and <br />actively pursued by the Village, he shall perform the balance of the <br />services to be rendered under this agreement and not previously per- <br />formed, and he shall credit against the total compensation due any <br />payments made under Sec. 2(c). <br />(d) The fee provided in Sec. 2(b) hereof, shall cover <br />engineering services including preliminary estimates and reports, com- <br />plete detailed plans and specifications, preparation of monthly and <br />final estimates for contractors' payments. The above schedule of fees <br />does not include property, topographic, boundary, or right-of-way <br />surveys, line and grade stakes, resident engineer, inspection of con- <br />struction, shop, mill, field or laboratory inspection of materials, cost <br />