Laserfiche WebLink
(1115.06 Cont'd) <br />~ 100 percent of the estimate of all the improvements guaranteeing <br />that he will install all the improvements thereafter within two yearn <br />of the approval of the final plat unless ea extension of time is <br />granted by Council. If approved, the developer may~conatruct sec- <br />tions of the improvements before approval of final plat and furnish a <br />performance guarantee bond, a surety bond or security for the con- <br />struction of the remaining improvements. <br />.. __ _~ _~._ _ _ If, however, after two years, or after the period of extension <br />granted by Council, the improvements have not been installed, the <br />Council may authorize the work to be completed and may then proceed <br />., against the developer and its surety.for reimbursement. <br />The developer may apply Yor final plat approval for only that <br />section of an approved preliminary plan of a subdiyieion which he <br />~-~ proposes to develop and record as the first stage, however, the <br />approval of any section of the preliminary plan shall become null <br />and void if an application for final plat approval is not submitted <br />within one year after approval of the preliminary plan, .unless an <br />extension of time is granted by the Commission. <br />b. Review by Engineer <br />The secretary of the Commission shall transmit two prints of <br />each drawing and the specifications to the Engineer for determination <br />if: <br />~~' 1. the final plat conforms to the approved preliminary plans <br />and any special conditions or modification stipulated, and <br />for correctness of mathematical data and computations; and <br />r ~ 2. the designs and details of the required improvements as <br />~i shown on the drakings.and specifications are in conformance <br />M1iSR I -28- <br />