My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1970 003 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1968-1970 Ordinances
>
1970 003 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:57:15 PM
Creation date
8/13/2018 9:04:03 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
003
Date
1/19/1970
Year
1970
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ga <br />Minimum Fees - Schedule 1 <br />Cost of Construction: <br />$ 100,000 <br />$100,000 500,000 <br />500,000 - 1,000,000 <br />12.0% <br />Base fee of 12% of $100,000 <br />Plus 7.5% of amount over <br />$100,000 <br />Base fee of S.4% of $500,000 <br />Plus 6% of amount over <br />$500,000 <br />General Engineering Projects - Schedule 2 <br />L~' <br />b <br />b <br />L•~ <br />Q <br />Lsl <br />w <br />CC <br />Ct1 <br />IG <br /> <br />Minor Roads and Streets in <br />Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood iJalls <br />Off-Street Parking Lots <br />Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and <br />Elevated Storage Tanks <br />Water, Coal, Oil and Gas <br />Transmission Pipelines <br />Minimum Fees - Schedule 2 <br />Cost of Construction: <br />$ 100,000 9% <br />$100,000 - 500,000 Base fee of 9% of $100,000 <br />Plus 6% of amount over $100,000 <br />500,000 1,000,000 Base fee of 6.6% of $500,000 <br />Plus 5% of amount over $500,000 <br />(c) If, after the plans, profiles, specifications and <br />estimates of costs for work authorized and approved by the Council have been <br />prepared by the Engineer, the proceedings for such ocvrk is abandoned, or is <br />postponed for a period of more than six (6) months, or the actual construction <br />of such work is not commenced within nine (9) months after the date of delivery <br />of said plan, profiles, specifications and estimates of cost, then he shall be <br />paid forthwith a sum equal to seventy-five percent (75%) of the fee stated in <br />Section 2(b), based on the total estimated cost of said improvements, as full <br />compensation for all work done up to that date upon the subject project. In the <br />event the proceedings for such work so abandoned, or postponed, is revived and <br />actively pursued by the Village, he shall perform the balance of the services to <br />be rendered under this agreement and not previously performed, and he shall credit <br />against the total compensation due any payments made under Section 2(c). <br />(d) The fee provided in Section 2(b) hereof, shall cover <br />engineering services including preliminary estimates and reports, complete detailed <br />plans and specifications, preparation of monthly and final estimates far contractors' <br />payments. The above schedule of fees does not include property, topographic, boundary <br />or right-of-caay surveys, line and grade stakes, resident engineer, inspection <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.