Laserfiche WebLink
1128.10 ALTERNATIVE ACTIONS <br />A. When Mayfield Village determines that site constraints compromise the intent of this regulation, <br />off-site alternatives may be used that result in an improvement of water quality and a reduction of <br />storm water quantity. Such alternatives shall meet the following standards: <br />Shall achieve the same level of storm water quantity and quality control that would be <br />achieved by the on-site controls required under this regulation. <br />2. .Implemented in the drainage area of the proposed development project to the maximum <br />extent practicable. <br />B. Alternative actions may include, but are not limited to the following. All alternative actions shall <br />be approved by the Mayfield Village Engineer: <br />Fees, in an amount specified by Mayfield Village to be applied to community-wide storm <br />water management practices. <br />2. Implementation of off-site storm water management practices and/or the retrofit of an <br />existing practice to increase quality and quantity control. <br />Stream, floodplain, or wetland restoration. <br />4. Acquisition or conservation easements on protected open space significantly contributing <br />to storm water control such as wetland complexes. <br />1128.11 EASEMENTS <br />Access to storm water management practices as required by the Mayfield Village Engineer for inspections <br />and maintenance shall be secured by easements. The following conditions shall apply to all easements: <br />A. Easements shall be included in the Inspection and Maintenance Agreement submitted with the <br />Comprehensive Storm Water Management Plan. <br />B. Easements shall be approved by Mayfield Village prior to approval of a fmal plat and shall be <br />recorded with the Cuyahoga County Auditor and on all property deeds. <br />C. Unless otherwise required by the Mayfield Village Engineer, access easements between a public <br />right-of--way and all storm water management practices shall be no less than 25-feet wide. The <br />easement shall also incorporate the entire practice plus an additiona125-foot wide band around the <br />perimeter of the storm water management practice. <br />D. The easement shall be graded and/or stabilized as necessary to allow maintenance equipment to <br />access and manipulate around and within each facility, as defined in the Inspection and <br />Maintenance Agreement for the site. <br />E. Easements to structural storm water management practices shall be restricted against the <br />